The Commonwealth of Kentucky is seeking bids for exterior repairs to the Middleton Hall building at the Kentucky School for the Deaf. The project includes removal and replacement of approximately 24,000 square feet of existing exterior façade materials, installation of new spray foam insulation, and replacement of approximately 3,500 square feet of existing exterior windows and doors. The proposed cladding system consists of metal wall panels installed over continuous insulation and an air and moisture barrier system.
• The project requires a site visit, which will be held on 02/24/2026 at 10:00 A.M. Eastern Time.
• Bidders must submit their bids electronically through the Commonwealth's eProcurement system.
• The project is expected to be completed within a few months, although the exact duration is not specified.
• The successful bidder will be required to provide a complete and continuous building envelope system.
• The project includes accessories required to provide a complete and continuous building envelope system.
• The metal wall panel system includes three colors, as indicated in the contract documents.