Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Atchafalaya River Bay, Bar, and Crewboat Cut Cutterhead…

U.S. Department Of Defense·Louisiana

Atchafalaya River Bay, Bar, and Crewboat Cut Cutterhead Dredge No. 2-2024, St. Mary Parish, Louisiana. Specification No. OM24060

Closes 4/16/2026$10M – $25MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Army Corps of Engineers is soliciting bids for the Atchafalaya River Bay, Bar, and Crewboat Cut Cutterhead Dredge No. 2-2024 project in St. Mary Parish, Louisiana. The project involves furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. The magnitude of construction is between $10,000,000 and $25,000,000. The contractor shall begin performance within 240 hours after receipt of the Notice to Proceed and complete the work within the specified contract duration. • The project requires the contractor to provide a dredge and attendant plant, complete and in full operating condition, with full operating personnel. • The contractor shall maintain an Internet connection capable of transmitting real-time data to the DQM server. • The contractor shall provide a dedicated onboard computer for use by the Dredging Quality Management system. • The contractor shall ensure that the dredge and attendant plant meet the requirements of the specifications. • The contractor shall comply with all applicable laws and regulations, including those related to safety, health, and environmental protection.

Attached files

Contact

Lauren A. Gandolfi(Contract Specialist)

[email protected]

(504) 862-2466

Key dates

Opened
4/2/2024
Closes
4/16/2026
Duration
73 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W912P824B0032

Budget estimate

$10,000,000 – $25,000,000

Based on the project's magnitude of construction, which is between $10,000,000 and $25,000,000, the budget for this project is likely to be in the same range. The actual budget will depend on the bid price and the terms of the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 86%

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

84% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 4-2026, OM26062

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

83% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 4-2026, OM26062

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Louisiana

83% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 2-2026, OM26060

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

83% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Louisiana

83% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 1-2026, OM26059

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

82% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 2-2026, OM26060

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Louisiana

81% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 1-2026, OM26059

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Louisiana

80% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

79% match

New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025

Closes 6/12/2027Opened 6/12/2025

U.S. Department Of Defense·Louisiana

78% match

New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025

Closes 3/31/2027Opened 3/31/2025

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

78% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 1-2025

Closes 4/21/2027Opened 4/22/2025

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025

Closes 2/28/2027Opened 4/21/2025

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

77% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

77% match

Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)

Closes 8/16/2028Opened 8/17/2026