The University of California, Los Angeles is seeking a qualified general‑building contractor to renovate seven laboratory spaces on the 5th floor of Young Hall. The work includes demolition, new flooring, wall finishes, casework, installation of university‑provided fume hoods, mechanical, electrical, and life‑safety upgrades, as well as ADA‑compliant restroom and fixture improvements. The contract is a lump‑sum public‑work award valued at approximately $3.1 million and requires compliance with California prevailing‑wage rules and execution of material‑assignment agreements for the fume hoods and casework.
• Renovate 7 labs (~4,672 gsf) with new benches, storage units, and solvent‑purification systems.
• Upgrade HVAC, lighting, fire‑sprinkler, and alarm systems; install new fan‑coil units and ductwork.
• Perform ADA upgrades to corridors, restrooms, and drinking fountains; ensure all work meets UC Fair Wage requirements.
• Mandatory pre‑bid Zoom conference (Jan 21 2026 10 a.m.) and on‑site job walk (Jan 21 2026 1 p.m.).
• Bids due by March 10 2026 2 p.m.; contractor must hold a current California B‑License and submit a pre‑qualification questionnaire.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.