The Natural Resources Department is seeking bids for the rehabilitation of hiking trails at the Lake Vermilion-Soudan Underground Mine State Park. The project involves replenishing approximately 152 cubic yards of gravel loss, building 30 C steps and 19 water bars or rolling dips, and installing a 30-foot extension to an existing wooden walkway. The successful bidder will be required to provide labor, equipment, materials, tools, transportation, and incidentals necessary to complete the project. The bid must include all costs, including labor, materials, tools, transportation, equipment, sales tax, and use tax.
Key points to consider:
• The project requires the rehabilitation of hiking trails at the Lake Vermilion-Soudan Underground Mine State Park.
• The project involves replenishing approximately 152 cubic yards of gravel loss.
• The project requires the building of 30 C steps and 19 water bars or rolling dips.
• The project requires the installation of a 30-foot extension to an existing wooden walkway.
• The successful bidder will be required to provide labor, equipment, materials, tools, transportation, and incidentals necessary to complete the project.
• The bid must include all costs, including labor, materials, tools, transportation, equipment, sales tax, and use tax.