Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›TMT STORM DRAIN UPGRADES – ENSTRUCTURE YARD

Jacksonville Port Authority·Florida

TMT STORM DRAIN UPGRADES – ENSTRUCTURE YARD

Closes 1/29/2026$450k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Jacksonville Port Authority (JAXPORT) is soliciting qualified contractors to replace defective 24‑in. concrete storm‑drain pipe (CMP) with new 24‑in. reinforced concrete pipe (RCP) in the Enstructure Yard at the Talleyrand Marine Terminal. The work involves utility locate, excavation, removal of existing pipe, installation of new pipe with joint wrapping, back‑filling using flowable fill, and reinstating the asphalt surface. The contract includes a base scope of 165 LF and an optional 145 LF that the owner may exercise. The project must be completed within a 50‑day performance period after the Notice to Proceed and includes strict safety, environmental, TWIC, and SEB participation requirements. • Replace 310 LF of storm‑drain pipe (165 LF base + up to 145 LF optional) with 24‑in. RCP. • Perform site preparation, utility locating, excavation, pipe installation, flowable‑fill backfill, and asphalt restoration. • Must meet FDOT specifications, provide required bonds and insurance, achieve a 10 % SEB participation goal, and adhere to TWIC/escort security protocols.

Attached files

Contact

Michael McCoy(Coordinator, Vendor Management & SEB Programs)

[email protected]

(904) 357-3003

Key dates

Opened
12/26/2025
Questions due
1/9/2026
Pre-bid meeting
1/6/2026
Site visit
1/6/2026Mandatory
Closes
1/29/2026
Duration
50 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
ITB_MC-2032

Budget estimate

$450,000 – $1,000,000

Based on typical civil‑construction costs for 24‑in. reinforced concrete pipe replacement (including excavation, flowable‑fill backfill, and asphalt restoration) ranging from $1,500 to $3,200 per linear foot, the 310 LF scope would likely generate a contract value between roughly $465,000 and $992,000. Factoring in the optional 145 LF (if exercised) pushes the high end toward $1.3 M. Therefore, a realistic earning range for a qualified contractor is approximately $450 K‑$1 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 73%

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

73% match

Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/29/2026

City of Charlotte·North Carolina

72% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

72% match

Moorland Dr 3831 Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

City of Charlotte·North Carolina

72% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

72% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

72% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

71% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

71% match

Wood Dale Ter 2022 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/23/2026

Maryland Baltimore City Department of Public Works·Maryland

71% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

71% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

71% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

71% match

Euclid Avenue 1818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Valdosta·Georgia

71% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Charlotte·North Carolina

71% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

City of Charlotte·North Carolina

70% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

70% match

Collective Storm Drainage Improvement Project Series X

Rolling / TBD closeOpened 5/29/2026

City of Charlotte·North Carolina

70% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Brandon·Mississippi

70% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

70% match

Craighead/Tryon Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/14/2026

City of Charlotte·North Carolina

70% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

70% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Georgia City of Valdosta·Georgia

70% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Charlotte·North Carolina

70% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

70% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027