The Adrian Public Schools is seeking a contractor to perform asbestos abatement at Adrian High School. The project involves the removal of asbestos-containing materials from the school's tunnel systems and rooms C110 and D100A. The contractor will be responsible for constructing full enclosures, removing and disposing of asbestos-containing materials, and providing all necessary utilities and safety equipment. The project is expected to start on May 11, 2026, and be completed by June 2, 2026. The contractor will be required to attend a pre-start meeting and post-bid examination, and will be subject to liquidated damages if the project is not completed on time or if the post-abatement air sampling tests do not pass the required levels.
Some key aspects of the project include:
• The removal of approximately 1,300 linear feet of pipe insulation and pipe fitting insulation from the tunnel systems
• The removal of approximately 115 linear feet of pipe insulation and pipe fitting insulation from rooms C110 and D100A
• The construction of full enclosures and decontamination chambers
• The provision of air filtration devices and safety equipment
• The requirement for the contractor to attend a pre-start meeting and post-bid examination
• The subject of liquidated damages if the project is not completed on time or if the post-abatement air sampling tests do not pass the required levels