Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Construction
  5. ›Roofing Improvements For The Wastewater Plant Laboratory

City of Centralia·Illinois

Roofing Improvements For The Wastewater Plant Laboratory

Closes 4/24/2026$40k – $70kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Centralia is seeking a qualified contractor to replace the roofing system on two laboratory roofs at its Wastewater Plant. The work includes complete removal of the existing roof, substrate preparation, and installation of a new reinforced‑membrane adhered roofing system (60‑mil TPO or equivalent Dura‑Tuff), along with all required materials, labor, equipment, permits, and waste disposal. The project covers approximately 3,862 sq ft of roof area and must be completed by July 30, 2026. The bid must include a 5 % deposit and comply with Illinois prevailing‑wage requirements and a 20‑year warranty. • Scope: tear‑off, substrate prep, install 60‑mil TPO (or equivalent) roofing membrane, flashings, sealants, and related accessories. • Technical specs: ASTM D6878‑compliant TPO, 3/8″‑1″ polyiso insulation, specified adhesives, fasteners, and metal edging; 20‑year warranty, 55 mph wind rating. • Financial/contractual: 5 % bid deposit, prevailing‑wage compliance, insurance minimums, liquidated damages ($500/day first 28 days, $1,000/day thereafter).

Attached files

Contact

Kim Enke(City Clerk)

Key dates

Opened
4/2/2026
Closes
4/24/2026
Duration
97 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238160

Budget estimate

$40,000 – $70,000

Based on the total roof area of roughly 3,862 sq ft and typical commercial TPO roofing installation costs ranging from $10 to $15 per square foot (including labor, materials, disposal, and overhead), the contract value is estimated between $38,600 and $57,900. Adding contingencies, bonding, insurance, and the 20‑year warranty obligations could push the final budget range to approximately $40,000 – $70,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Chicago·Illinois

Top match · 71%

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

U.S. Department Of Defense·District of Columbia

70% match

N0017327Q5317- Roof Membrane Replacement and Waterproofing

Closes 11/6/2026Opened 10/27/2026

U.S. Department Of Energy·New Jersey

70% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

Northern Kentucky Water District·Kentucky

69% match

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

The University of North Carolina·North Carolina

68% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

City of Franklin·Tennessee

68% match

Wastewater Treatment Laboratory Services

Closes 11/4/2026Opened 10/8/2026

New York City Department of Design and Construction·New York

68% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 11/12/2024

U.S. Department Of Veterans Affairs·Washington

68% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

Mississippi Department of Finance and Administration·Mississippi

68% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026

New York City Department of Design and Construction·New York

68% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016

City of Eureka Springs·Arkansas

68% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

U.S. Department Of Agriculture·North Carolina

68% match

Roof Repair

Closes 11/10/2026Opened 10/7/2026

City of Palm Springs·California

68% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Veterans Affairs·Washington

68% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

New York City Department of Design and Construction·New York

68% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

City of Franklin·Tennessee

68% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 11/4/2026Opened 10/8/2026

New York City Department of Design and Construction·New York

67% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 4/27/2026

New York City Department of Environmental Protection·New York

67% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

66% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

The University of North Carolina·North Carolina

66% match

Parking Lot RS-12 Resurfacing and Safety Improvements

Closes 11/3/2026Opened 1/9/2025

City of Opa-locka·Florida

66% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026