Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›102" Anacostia Trunk Sewer Rehabilitation Phase 2…

Washington Suburban Sanitary Commission, MD·Maryland

102" Anacostia Trunk Sewer Rehabilitation Phase 2 - Progressive Design-Build

Closes 6/23/2026$50M – $100MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Washington Suburban Sanitary Commission (WSSC) is seeking a design-build team for the rehabilitation of the 102-inch Anacostia Trunk Sewer (Phase II) in Prince George's County, Maryland. The project involves the design and construction of the sewer rehabilitation using a progressive design-build approach. The design-build team will be responsible for managing the integration and utilization of various team members, including the design firm, contractor, and specialty disciplines. The team must demonstrate experience in large diameter pipeline design, construction, and rehabilitation, as well as experience with collaborative delivery methods and progressive design-build projects. The proposal will be evaluated based on factors such as design-build team experience, key project team members' experience, project management, and project approach. Some key points to note are: • The design-build team must have a minimum of 10 years of experience in collaborative delivery projects, with at least 5 years specific to large diameter pipeline design, construction, and rehabilitation. • The team must have completed at least three sewer rehabilitation projects involving pipes 60 inches or greater within the last 10 years, with at least two of these projects performed in environmentally sensitive areas. • The team must have completed at least one progressive design-build project. • The proposal must include a detailed description of the team's management approach, coordination and communication protocols, and tools and processes used to maintain transparency and alignment.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lawrence Cumberbatch2(Procurement Officer)

[email protected]

(301) 206-8892

Key dates

Opened
5/13/2026
Questions due
6/3/2026
Pre-bid meeting
5/26/2026
Closes
6/23/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
106580

Budget estimate

$50,000,000 – $100,000,000

The budget for this project can be estimated based on the scope of work and the requirements for the design-build team. The project involves the rehabilitation of a 102-inch sewer trunk line, which is a significant infrastructure project. The design-build team will be responsible for managing the integration and utilization of various team members, including the design firm, contractor, and specialty disciplines. The team must demonstrate experience in large diameter pipeline design, construction, and rehabilitation, as well as experience with collaborative delivery methods and progressive design-build projects. Based on industry standards and the scope of work, the budget for this project could be in the range of $50 million to $100 million. This estimate is based on the assumption that the project will require significant resources, including design and construction personnel, equipment, and materials. The budget will depend on the final scope of work, the complexity of the project, and the experience and qualifications of the design-build team. Factors that may influence the likely payment range include: - The size and complexity of the project - The experience and qualifications of the design-build team - The scope of work and the requirements for the project - The location of the project and the availability of resources - The timeline for the project and the need for expedited completion

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Missouri

Top match · 75%

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Cincinnati·Ohio

74% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Braintree·Massachusetts

74% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

City of Cincinnati·Ohio

74% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Rosenberg·Texas

73% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Cincinnati - Purchasing Division·Ohio

73% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

City of Ponca·Oklahoma

73% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

Metropolitan Sewer District of Greater Cincinnati·Ohio

72% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

City of Philadelphia·Pennsylvania

72% match

PW Bid 2325 -SEWER RECONSTRUCTION and RELAY of WATER MAINS in S. CONESTOGA ST from LUDLOW ST to MARK

Closes 11/13/2026Opened 10/23/2026

City of Philadelphia·Pennsylvania

72% match

PW Bid 2521-SEWER RECONSTRUCTION and RELAY of WATER MAINS in MANTON ST FROM S. 8TH ST to S. 7TH ST

Closes 11/10/2026Opened 10/28/2026

Maryland Baltimore County Government·Maryland

72% match

20127 SX0 Jennifer Branch Relief Sewer Consent Decree

Closes 11/5/2026Opened 9/26/2026

City of Douglas·Wyoming

72% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

72% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

City of American Canyon·California

72% match

2026 Sewer Rehabilitation Project

Closes 4/1/2027Opened 9/17/2026

City of Thomas·Oklahoma

72% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

Greenwood Metropolitan District·South Carolina

71% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

Erie County·New York

71% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

West County Wastewater·California

71% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Des Moines - Iowa·Iowa

71% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

Orange County Sanitation District, CA·California

71% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

City of Cincinnati·Ohio

71% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Connecticut Town of Fairfield·Connecticut

71% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

71% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

71% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/14/2026

City of Rapid City·South Dakota

71% match

Lacrosse Street Sanitary Sewer Reconstruction

Closes 11/17/2026Opened 10/29/2026