Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›Allen Bayou Relief Erosion Control and Embankment…

Livingston Parish Gravity Drainage District No. 1·Louisiana

Allen Bayou Relief Erosion Control and Embankment Stabilization Project

Closes 9/3/2026$200k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Livingston Parish Gravity Drainage District No. 1 is soliciting sealed bids for the Allen Bayou Relief Erosion Control and Embankment Stabilization Project. The work involves improving approximately 300 feet of ditch and embankment slope, installing erosion protection and rip‑rap, and replacing two existing culverts as shown on the provided plans and specifications. Bidders must submit a bid form, a bid bond of at least 5 % of the proposed price, and meet licensing requirements (Class IV Louisiana Contractors license). A mandatory pre‑bid conference is scheduled, and all bids must be received by the deadline. • Scope includes grading, ditch improvement, embankment stabilization, rip‑rap placement, and culvert replacement. • Bids must be submitted on the Louisiana Uniform Public Works Bid Form with a 5 % bid bond payable to Livingston Parish. • Requires Class IV Louisiana contractor license; pre‑bid conference mandatory on August 25, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tye Fitzgerald(Project Manager)

(504) 322-2783

Key dates

Opened
8/6/2026
Pre-bid meeting
8/25/2026Mandatory
Closes
9/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
Invitation for Bids: 25911756

Budget estimate

$200,000 – $500,000

Based on the scope (300 ft ditch, embankment stabilization, rip‑rap, and two culvert replacements) and typical unit costs for civil earthwork and concrete work in Louisiana, a reasonable cost range is roughly $200,000 to $500,000. Factors influencing the estimate include site conditions, material prices (e.g., rip‑rap), labor rates, and any unforeseen subsurface conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 73%

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

U.S. Department Of The Interior·Colorado

73% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

Town of Church Point·Louisiana

70% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

City of Anderson·South Carolina

70% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

North Lafourche Conservation, Levee and Drainage District·Louisiana

69% match

Reach 1 Site Preparation Project - Morganza To the Gulf Risk Reduction System

Closes 12/3/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

69% match

AMR, Beulah Rd Wilkins Twp. (Lucia Dr), Allegheny

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

69% match

Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)

Closes 8/31/2027Opened 7/23/2026

U.S. Department Of Defense·Louisiana

69% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/22/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

68% match

Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)

Closes 8/16/2028Opened 8/17/2026

City of Austin·Texas

68% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

North Carolina County of Mecklenburg·North Carolina

68% match

Barlowe Road Flood Mitigation and Water Quality Improvement Project

Closes 11/19/2026Opened 10/26/2026

U.S. Department Of Defense·South Dakota

68% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Township of North Brunswick·New Jersey

68% match

West Lawrence Pump Station Bank Stabilization Project

Closes 11/17/2026Opened 10/29/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

68% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·Texas

68% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025