Spokane County is soliciting a qualified contractor to perform a complete renovation of the third floor of the Monroe Court Building. The scope includes demolition of existing interior finishes, upgrades to mechanical, electrical, and plumbing systems, ADA‑compliant restroom renovations, interior office re‑configuration, and optional alternates such as bullet‑resistant glazing, manual roller shades, and a victim‑advocates area. The contractor must supply all labor, materials, equipment, permits, and coordinate with utilities and city inspections. The engineer’s cost estimate is $3,100,000 plus tax, with three bid alternates ranging from $15,000 to $160,000. The project is a design‑build effort requiring compliance with IBC, NEC, and Washington state energy codes. Key points: • Full scope renovation of 3rd floor (≈27,000 sf) • Demolition, interior finishes, MEP upgrades • ADA restroom upgrades • Optional bullet‑resistant glazing, roller shades, victim‑advocates area • Contractor responsible for permits, inspections, safety, and site protection • Engineer’s estimate $3.1 M (plus tax) • Pre‑bid conference Sep 2 2026 (site tour) • Bid submission deadline Oct 7 2026.