Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nebraska guideNebraska Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nebraska
  4. ›Civil Engineering
  5. ›OPW 53907: Papillion Creek Interceptor Rehabilitation

Douglas County·Nebraska

OPW 53907: Papillion Creek Interceptor Rehabilitation

Closes 10/7/2026$5M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Omaha is soliciting qualified contractors to design and construct storm‑water penetrations and rehabilitate manholes/structures for the Papillion Creek Interceptor (OPW 53907). The scope includes full‑depth open‑cut excavation, pipe replacement, structural repairs, installation of PVC liners, temporary bypass pumping, and comprehensive quality‑control testing. Bidders must provide a Class A or B General Contractor license from the City of Bellevue, submit an Economic Sustainability Plan, and may utilize apprentice incentives. The contract requires bid security (5 % of bid), performance and payment bonds, and compliance with small‑business participation goals. Work is expected to begin on 1 Dec 2026 and may extend beyond March 2027. • Construct storm‑penetrations in a gravity interceptor sewer. • Rehabilitate existing manholes and structures, including PVC liner installation. • Perform full‑depth open‑cut excavation, shoring, dewatering, and backfill. • Provide temporary bypass pumping with standby pumps (design at contractor’s discretion). • Submit detailed Economic Sustainability Plan and optional Apprenticeship Incentive Form. • Must hold a Class A/B General Contractor license from City of Bellevue at bid time. • Bid security: 5 % of total bid price; performance and payment bonds required. • Anticipated Notice‑to‑Proceed: 1 Dec 2026; project likely spans ~12 months. • Pre‑bid conference: 31 Aug 2026 (attendance may be required). • Small & Emerging Business (SEB) participation and certification encouraged.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carol Buhr

Key dates

Opened
8/19/2026
Questions due
9/27/2026
Pre-bid meeting
8/31/2026
Closes
10/7/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
CI-2026-0114 Addendum 3

Budget estimate

$5,000,000 – $10,000,000

Based on typical unit costs for interceptor rehabilitation (approximately $300–$600 per linear foot) and the likely length of the Papillion Creek interceptor (estimated 8,000–15,000 ft), total construction costs are expected to fall between $5 million and $10 million. This range accounts for excavation, pipe and liner materials, labor, temporary bypass systems, and required bonds and insurance. The client’s profit margin on public works contracts of this size usually ranges from 5 % to 10 %, suggesting a net earnings window of roughly $250,000 to $1,000,000. Factors influencing the final budget include exact project length, site conditions (soil, groundwater), any change‑order work, and the extent of SEB/Apprenticeship incentives utilized.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Indiana

Top match · 72%

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

Metropolitan Council·Minnesota

71% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

Maryland Baltimore County Government·Maryland

71% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

68% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

Maryland Baltimore County Government·Maryland

68% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

Greenwood Metropolitan District·South Carolina

68% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

68% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

Gwinnett County Government·Georgia

68% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

West County Wastewater·California

68% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Gwinnett County Government·Georgia

67% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

City of Rancho Palos Verdes·California

67% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

U.S. Department Of The Interior·Colorado

67% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park (Electrical Contract)

Closes 12/3/2026Opened 10/28/2026

City of Austin·Texas

66% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Maple Grove·Minnesota

66% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

Nevada Government·Nevada

66% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Johnson County Wastewater·Kansas

66% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

U.S. Department Of The Interior·Wyoming

66% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Georgia City of Sandy Springs·Georgia

66% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

U.S. Department Of Defense·Missouri

66% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Village of Cary·Illinois

66% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

Massachusetts Town of Marion·Massachusetts

66% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

66% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026