Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Construction
  5. ›Lolo Street Bridge Replacement Bid Set with Bridge Plans &…

Missoula County·Montana

Lolo Street Bridge Replacement Bid Set with Bridge Plans & Water Main Plans IFB, Geotechnical Report, Beau Geste Addition Lot 1 TCE, Orrsdale No. 3 Lots 1 $ 3 Slope Easement, 318 Permit Authorization

Closes 10/14/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Missoula County Public Works Department is soliciting bids for the complete replacement of the Lolo Street Bridge, associated roadway reconstruction, and a new water‑main installation. The work includes demolition of the existing bridge, construction of a new prestressed‑concrete girder bridge (≈ 95 ft span), full removal and replacement of pavement, curb, gutter, sidewalks, utility relocations (power, gas, communications, water), extensive erosion‑control, environmental mitigation for Bull Trout and Kootenai Sturgeon, and compliance with federal‑aid, Davis‑Bacon, Build‑America‑Buy‑America, and DBE requirements. Bidders must attend a mandatory pre‑bid conference, submit a 10 % bid bond, and provide required performance/pay‑bond and insurance. The contract will be awarded on a lump‑sum basis with a 400‑day substantial‑completion schedule. • Bridge demolition and new prestressed‑concrete girder bridge construction (abutments, bearings, railings). • Full roadway and pavement reconstruction, curb‑and‑gutter, sidewalks, ADA‑compliant curb ramps, and traffic‑control upgrades. • Installation of a 12‑in. Class 350 ductile‑iron water main suspended from the new bridge, plus related utility relocations. • Comprehensive environmental measures (stream‑habitat protection, bio‑engineering, seeding, riparian restoration). • Mandatory compliance with FHWA‑1273, Davis‑Bacon wage rates, BABA, DBE participation, and extensive insurance/bonding requirements.

Attached files

Contact

Jacob Roske(Project Engineer)

[email protected]

(406) 721-4320

Key dates

Opened
9/17/2026
Questions due
10/7/2026
Pre-bid meeting
9/30/2026Mandatory
Closes
10/14/2026
Duration
400 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PWFY26‑001

Budget estimate

$500,000 – $1,500,000

Based on the scope—new bridge, full roadway reconstruction, water‑main installation, extensive environmental mitigation, and required bonds/insurance—the total contract value for a project of this size in a moderate‑cost market like Missoula typically ranges between $5 million and $12 million. Assuming a 5‑year firm overhead and profit margin of 10‑15 %, a contractor’s net earnings would likely fall in the $500 k to $1.5 million range. The estimate reflects material costs (concrete, steel, ductile‑iron pipe), labor (prevailing‑wage rates), equipment, and subcontractor fees.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

LA Public Works Engineering Bureau·California

Top match · 75%

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

California Department of Transportation·California

75% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

City of St. Louis Board of Public Service·Missouri

73% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of St. Louis Board of Public Service·Missouri

73% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Caddo Parish Commission·Louisiana

73% match

26-17, Mira Myrtis Road Bridge Replacement Project

Closes 11/12/2026Opened 10/21/2026

Town of Pulaski·Virginia

73% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Division of Highways·North Carolina

73% match

Contract DN01168 – Bridge #860152 Replacement over Alarka Creek (SR 1185)

Closes 11/10/2026Opened 10/20/2026

Daviess County·Missouri

73% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Georgia City of Chattahoochee Hills·Georgia

72% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

CPPJ Road, Bridge, & Utility·Louisiana

72% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

City of Meriden·Connecticut

72% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Carver County·Minnesota

72% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

CPPJ Road, Bridge, & Utility·Louisiana

72% match

West Parish Road Bridge Replacement Project

Closes 11/5/2026Opened 10/8/2026

Maryland Worcester County Government·Maryland

72% match

Hotel Road Bridge Replacement

Closes 12/15/2026Opened 10/30/2026

Virginia Department of Transportation·Virginia

72% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Oregon Department of Transportation·Oregon

72% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Division of Highways·North Carolina

72% match

DK00484 Invitation to Bid

Closes 11/18/2026Opened 10/29/2026

Division of Highways·North Carolina

72% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

City of St. Louis·Missouri

72% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Frontenac·Missouri

72% match

STP-5503(609) - Spoede Road Bridge Replacement

Closes 11/2/2026Opened 9/15/2026

County of Chester·Pennsylvania

71% match

Bridge Rehabilitation for County Bridge #196 and Construction for County Bridge #326

Closes 11/25/2026Opened 10/23/2026

Arkansas

71% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

71% match

RED TRAIL SLAB BRIDGE REPLACEMENT

Closes 11/2/2026Opened 10/9/2026

City of Cedar Rapids·Iowa

71% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Missouri Department of Transportation·Missouri

71% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026