Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›Mission Road Water Main Loop

Howard County, Office of Procurement·Maryland

Mission Road Water Main Loop

Closes 11/12/2025$1.5M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Howard County, Office of Procurement and Contract Administration, is seeking bids for the installation of approximately 3,900 linear feet of 6-inch, 8-inch, 12-inch, and 14-inch water distribution main loop along Samuel Morse Drive, Columbia Gateway Corporate Center, and Mission Road in Howard County. The project includes crossing Interstate Highway I-95 inside an existing pipe/casing, a new pressure zone division valve, new fire hydrants, traffic control, surface restoration, soil erosion and sediment control plan requirements, and all other miscellaneous appurtenances and incidental work as shown on the contract drawings. Key requirements for bidders include a minimum of 10 years of experience in the installation of municipal water mains and the ability to demonstrate expertise in sheeting and shoring for deep excavation exceeding 25 feet in depth. • The project is located in Howard County, Maryland. • The estimated project duration is 270 calendar days. • The project requires bidders to have experience with ductile iron pipe (DIP) and C900 PVC water main materials. • The project involves directional drilling methods. • Bidders must provide a detailed list of recently completed projects meeting the specified experience requirements. • The project requires compliance with the Unified Soil Classification System (USCS) and the American Society for Testing and Materials (ASTM) standards.

Attached files

Contact

Michael Decker(Buyer/Procurement Agent)

[email protected]

(410) 313-6375

Key dates

Opened
9/8/2025
Pre-bid meeting
9/23/2025
Site visit
9/23/2025
Closes
11/12/2025
Duration
270 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB 2026-11

Budget estimate

$1,500,000 – $3,000,000

Based on the project details, the estimated budget for this project can range from $1,500,000 to $3,000,000. This estimate is derived from the scope of work, which includes the installation of approximately 3,900 linear feet of water distribution mains, and the requirements for bidders to have experience with ductile iron pipe (DIP) and C900 PVC water main materials. The actual budget may vary depending on the bidder's experience, the complexity of the project, and the final contract price. Factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as any potential change orders or unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Clermont County - Board of Commissioners·Ohio

Top match · 67%

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Fort Bend County Municipal Utility District No. 134A·Texas

65% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

Hastings Utilities·Nebraska

64% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Grand Rapids Department of Engineering·Michigan

64% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

NYS Alden, Town of·New York

64% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Northern Kentucky Water District·Kentucky

63% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

City of Waukegan·Illinois

63% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Northern Kentucky Water District·Kentucky

63% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

City of DeLand·Florida

63% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

CPPJ- Special Service Districts·Louisiana

62% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

Gwinnett County Government·Georgia

62% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

City of Ontario·California

62% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Goodwyn Mills Cawood·Georgia

62% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Florida Governmental Utility Authority·Florida

61% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

Town of Eatonville·Florida

61% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Massachusetts Town of Westborough·Massachusetts

61% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Oregon Tualatin Valley Water District·Oregon

61% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of McCook·Nebraska

61% match

South 3rd Street Water System Improvements

Closes 11/10/2026Opened 10/21/2026

City of Edgewater, FL·Florida

61% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Augusta, GA (Augusta Commission)·Georgia

61% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Oak Manor Municipal Utility District·Texas

61% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

Massachusetts Town of Plymouth·Massachusetts

61% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

City of Riverside·California

61% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Georgia Rockdale County Board of Commissioners·Georgia

61% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026