This public‑sector sealed‑bid project calls for the design‑build style construction of two lighted basketball courts at Lenora Park, including site grading, concrete work, retaining walls, chain‑link fencing, LED lighting, utility extensions, irrigation, landscaping, and associated storm‑water controls. The contractor must provide a 5 % bid bond, 100 % performance and payment bonds, and meet Georgia‑state insurance and surety rating requirements (A‑M Best A‑8 or higher). The contract is awarded to the lowest responsive and responsible bidder, with a 120‑day construction window (Nov 9 2026 – Mar 8 2027) and liquidated damages of $500 per day for overruns. Key considerations include the mandatory 20 % self‑performance requirement, retainage of 5 %, and the need to coordinate with multiple design consultants.
• Build two lighted basketball courts with surfacing, lighting, and ball‑return systems.
• Provide site work: grading, retaining wall, chain‑link fencing, utility installs (electrical, water), irrigation, landscaping, and storm‑water BMPs.
• Meet bonding (5 % bid bond, 100 % performance/payment bonds) and insurance limits; maintain a full‑time superintendent on‑site.