The U.S. Embassy Guatemala – INL requires the acquisition of prefabricated structures that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The Contractor shall furnish and install all materials required by this contract. The contract drawings are set forth in Section J as Attachment 1. For a thorough understanding of the requirements, the Contractor must design and deliver one building for a classroom, that will accommodate 30 students. The building must be made by using prefabricated modules. Key features of the building include:
* Four seamlessly joined modular prefabricated units of no less than 5.80 m (length) x 2.35 m (wide) x 2.65 m (height)
* Classroom designed to house 30 students
* Reinforced concrete floor with a minimum of ten (10) centimeters thick with a minimum resistance of 3,000 psi concrete
* Galvanized steel tube frame structure
* Flooring made of 19 mm minimum thick water-resistant chipboard
* Eight PVC French-type windows
* Two PVC single doors
* Eight 120V grounded double power outlets
* Eight LED panel lights
* Two mini-split air conditioning units
* One main grounded electrical breaker box
* Two emergency LED lamps
* One battery-operated smoke detector
* One 20-pound type ABC fire extinguisher
The Contractor shall perform concrete tests to verify that the minimum load capacity requested was achieved. The Contractor shall also provide shop drawings (blueprints) for approval that incorporate all design elements.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.