Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Powerhouse 1 and 2 DC Panel Board Replacement

U.S. Department Of Defense·Nebraska

Powerhouse 1 and 2 DC Panel Board Replacement

Closes 1/22/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. • The project requires the replacement of electrical equipment in Powerhouse 1 and Powerhouse 2. • The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel. • The base scope for Powerhouse 2 includes the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. • The project requires the extension of main feeder wires by 20-30 feet to connect to the new panels. • The project requires the replacement of brittle sections below deck and the extension and finishing of existing concrete bases to accommodate the new equipment.

Attached files

Contact

Marc Proietto(Primary Point of Contact)

[email protected]

Key dates

Opened
10/10/2025
Pre-bid meeting
11/19/2025
Site visit
11/19/2025
Closes
1/22/2026
Duration
548 calendar days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
W9128F26RA010

Budget estimate

$1,000,000 – $5,000,000

The estimated construction cost of this project is between $1,000,000 and $5,000,000. This estimate is based on the information provided in the solicitation document, which includes the replacement of electrical equipment in Powerhouse 1 and Powerhouse 2. The actual budget may vary depending on the complexity of the project, the materials required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Education, NYS Dept. of·New York

Top match · 71%

NYSSD Electrical Panel Replacement

Closes 11/3/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Defense·Pennsylvania

64% match

61--PANEL,POWER DISTRIB, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/17/2026

NYS OGS Design & Construction - Construction Contractors·New York

63% match

Replace Electrical Panels – MacCormick Secure Center

Closes 11/18/2026Opened 10/13/2026

Webster Housing Authority·Massachusetts

63% match

Federal Pacific Panel Replacement

Closes 11/20/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

PANEL,CONTROL,ELECT

Closes 11/2/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

62% match

16--PANEL,ELECTRONICS,V, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/2/2026

General Services, NYS Office of·New York

61% match

Q1944CE: Replace Electrical Panels

Closes 11/18/2026Opened 10/14/2026

Pierce County·Washington

61% match

M&O Facility LED Lighting Replacement Project

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

60% match

PANEL,CONTROL,ELECT

Closes 11/10/2026Opened 10/20/2026

City of San Diego·California

60% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

U.S. Department Of Defense·Pennsylvania

60% match

16--PANEL,ELECTRONICS,V, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/16/2026

U.S. Department Of Defense·United States of America

60% match

CONTROL PANEL,AIRCR

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

60% match

PANEL,POWER DISTRIB

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Defense·Ohio

59% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

New York City Department of Environmental Protection·New York

59% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

U.S. Department Of Defense·Georgia

59% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 4/29/2026

Utility Board of the City of Key West·Florida

59% match

KEYS Bid 23-26 Specifications for Kennedy Drive Substation Bus Replacement

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

59% match

PANEL,PATCHING,COMM

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

59% match

70--PANEL PC, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 9/26/2026

U.S. Postal Service·Colorado

59% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

59% match

14--PANEL,STRUCTURAL,AI - AND OTHER REPLACEMENT PARTS

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of Defense·Ohio

59% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

U.S. Department Of Defense·United States of America

59% match

RUGGED,FLAT,PANEL

Closes 11/6/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

59% match

CONTROL PANEL,AIRCR

Closes 12/9/2026Opened 9/10/2026