The U.S. Army intends to increase capacity on the current Mechanical Multiple Award Task Order Contracts (MM) on a sole source basis. The MM will include construction, repair, and service tasks in the mechanical discipline. Mechanical work may include replacement, installation, repair and service of boilers, HVAC systems, plumbing, building control systems, Testing, Adjusting and Balancing of mechanical systems (TAB), and mechanical equipment. The work will be performed on facilities at Joint Base Lewis-McChord (JBLM), Washington.
• The contract period is five years from the date of award.
• Each Task Order Period of Performance shall be determined in the SOW and shall start at notice-to-proceed (NTP) of the individual Task Order.
• Task Orders typically do not exceed 180 calendar days.
• The Contractor shall provide all labor, equipment, and materials (except as indicated otherwise noted in the specific Task Order) and perform all work in strict accordance with the Task Order Statement Of Work (SOW), Specifications and Drawings required for this Multiple Award Task Order Contract (MATOC).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.