Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Sources Sought/Request for Information Upper Mississippi…

U.S. Department Of Defense·Illinois

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1

Closes 10/26/2026$5M – $10MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is conducting market research for the first stage of the Quincy Bay Habitat Rehabilitation and Enhancement Project, a multi‑year, multi‑phase restoration effort on the Upper Mississippi River in Adams County, Illinois. Stage 1 focuses on dredging approximately 260,000 cubic yards of material to create overwintering habitat for waterfowl, access dredging, topographic diversity features, bank stabilization along Cedar Creek, and the installation of river‑training structures. The work will involve mechanical excavation, side‑casting of material, placement of stone for bank stabilization, and careful environmental protection measures. Although no contract is being awarded now, the Corps may issue a future solicitation (potentially a FAR 14 Invitation for Bid) and is seeking capability statements, small‑business status, and references from firms capable of heavy civil construction, dredging, and ecological restoration. • Location: Quincy Bay, Adams County, Illinois (River Mile 327‑332, Pool 21). • Scope: Dredging ~260,000 cy over ~16,000 ft of channel; placement of 1,100 tons of stone; creation of topographic diversity and habitat features. • Required capabilities: Heavy civil construction, dredging, material handling, environmental compliance, bank stabilization, and river‑training structure installation. • Small‑business categories solicited (SB, HUBZone, SDVOSB, 8(a), veteran‑owned, woman‑owned, disadvantaged). • Submission: ≤5 single‑sided pages, emailed to Bobbi Boeh (and Troy Robbins) by the SAM.gov deadline. • Anticipated contract year: Primary construction slated for 2028.

Attached files

Contact

Bobbi Boeh(Contract Specialist)

[email protected]

(309) 794-5943

Key dates

Opened
9/22/2026
Closes
10/26/2026

Last updated

Details

Type
Request for Information
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912EK28UMRRQBProjectStage1

Budget estimate

$5,000,000 – $10,000,000

Based on the volume of work (≈260,000 cubic yards of dredging, 1,100 tons of stone placement, extensive site preparation, and environmental mitigation) and typical federal rates for heavy‑civil construction in the Midwest, a contract for Stage 1 could range roughly from $5 million to $10 million. The lower bound assumes minimal ancillary services and a lean contractor base; the upper bound reflects higher labor rates, equipment mobilization, and comprehensive environmental compliance costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Natural Resources·Illinois

Top match · 73%

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

Illinois Natural Resources·Illinois

72% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

U.S. DOC NOAA - ERA Production·United States of America

71% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

East Bay Municipal Utility District·California

71% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Santa Clara Valley Water District·California

70% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

California Grants·California

70% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Environmental Conservation, NYS Department of·New York

70% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Illinois

69% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

City of Fitchburg·Wisconsin

69% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

Illinois Natural Resources·Illinois

69% match

Illinois support of Upper Mississippi River Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Dept. of Treasury RESTORE Act Program·United States of America

69% match

RESTORE Act Direct Component ? Construction and Real Property Acquisition Activities

Closes 10/31/2026Opened 9/26/2024

California Grants·California

68% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

Environmental Conservation, NYS Department of·New York

68% match

Hudson River Estuary Grants for River Access Round 49

Closes 12/17/2026Opened 9/28/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025