Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›3TON Evaporator and Condensing unit

U.S. Department Of Defense·New York

3TON Evaporator and Condensing unit

Closes 3/25/2026$20k – $40kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The opportunity is for the procurement of a 3 TON Evaporator and 3 TON Condensing unit. The unit should have a power of 208/230-1-60, electric reheat, canister dehumidifier, scroll compressor with hot gas bypass capacity control, high head pressure switch for unit protection, epoxy coated coil with UV topcoat for extended coil life, and be designed for R-407C factory charged. The scope of work includes delivering two items to the final site at Puerto Rico, including crane service for equipment unloading at the site. Key features of the required equipment include: • Power: 208/230-1-60 • Electric reheat • Canister dehumidifier • Scroll compressor with hot gas bypass capacity control • High head pressure switch for unit protection • Epoxy coated coil with UV topcoat for extended coil life • Designed for R-407C factory charged

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Diana Ruiz

[email protected]

(787) 707-3346

Key dates

Opened
3/2/2026
Closes
3/25/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
333415
Solicitation №
W911S226U2680

Budget estimate

$20,000 – $40,000

The budget for this opportunity can be estimated based on the cost of the equipment and the delivery services. A 3 TON Evaporator and 3 TON Condensing unit can cost between $10,000 to $30,000, depending on the brand, quality, and features. The delivery and installation services, including crane service for equipment unloading, can add an additional $5,000 to $10,000 to the total cost. Therefore, the estimated budget for this opportunity can be between $20,000 to $40,000. Factors that may influence the likely payment range include the brand and quality of the equipment, the complexity of the installation, and the location of the delivery site.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 62%

41--COOLER,AIR,EVAPORATIVE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·California

62% match

41--CONDENSER,REFRIGERATIO

Closes 11/4/2026Opened 10/25/2026

Mississippi State University·Mississippi

62% match

Trane Condenser, Evaporator Coil & TXV Replacement

Closes 11/3/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

62% match

25--VENTILATOR,AIR CIRCULA

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Veterans Affairs·New York

62% match

4320--Condensate Receiver

Closes 11/1/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

61% match

45--UNIT HEATER,AIR CIRCUL

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

61% match

41--COOLER,AIR,EVAPORATIVE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

60% match

16--EVAPORATOR FAN,AIRC, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Health And Human Services·California

60% match

Cooling Tower Refurbishment - Three (3) Cells

Closes 11/2/2026Opened 10/26/2026

Rapides Parish Sheriff's Office·Louisiana

60% match

Addendum #1 100 TON AIR COOLED CHILLER DC3 CORRECTIONS

Closes 11/12/2026Opened 10/2/2026

U.S. Department Of Justice·Indiana

60% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·Pennsylvania

60% match

Dehumidifier Large Buy

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Agriculture·Utah

60% match

ANF Duchesne Bunkhouse AC Replacement

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

60% match

36--CHLORINATOR, ECG

Closes 12/10/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

60% match

41--COOLER,AIR,EVAPORATIVE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

59% match

REFRIGERATION UNIT,

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

59% match

59--HEAT SINK,ELECTRICA

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

59% match

41--COOLER UNIT,AIR

Closes 11/8/2026Opened 10/29/2026

York County·Maine

59% match

HVAC System Upgrade- Courthouse Condenser Units

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

59% match

VACUUM PUMP UNIT

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

59% match

43--FILTER UNIT,FLUID,PRES

Closes 11/1/2026Opened 10/22/2026

Jefferson County Public Schools·Kentucky

59% match

RFP 3200 - C/N for Walk-In Cooler/Freezer Units and Installation for Phase 45 Various Schools

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

59% match

41--COOLER UNIT,AIR

Closes 11/8/2026Opened 10/28/2026

City of Branson·Missouri

59% match

RFB 2896-12 Cooper Creek WWTF HVAC

Closes 11/12/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

59% match

59--HEAT SINK-INSULATOR

Closes 11/4/2026Opened 10/21/2026