Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Trade Package - SFO Recycled Water System Project - TP…

San Francisco Airport (Construction)·California

Trade Package - SFO Recycled Water System Project - TP 4023 - Glazed Sectional and Coiling Metal Overhead Doors

Closes 12/8/2025$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Recycled Water Systems Project involves designing and constructing an Advanced Water Treatment Plant (AWTP) and other facilities to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project includes the design and construction of a 250,000-gallon storage tank, pump station, and distribution system. The goal of the project is to design, construct, permit, activate, commission, and closeout the new construction for the Recycled Water System Project. The project requires the installation of glazed sectional and coiling metal overhead doors. Key aspects of the project include: • Furnish and install glazed sectional and coiling metal overhead doors • Provide and install anchor assembly and wind load design • Coordinate with electrician for installation of electrical service • Furnish and install joint sealant and weatherstripping • Provide seismic calculations as required by Engineer of Record

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tiffany Gonzalez-Ruiz(Contact for Trade Package information)

[email protected]

(650) 821-7863

Key dates

Opened
11/10/2025
Closes
12/8/2025

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
11431.66 - TP4023

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the materials required. The installation of glazed sectional and coiling metal overhead doors, wind load design, and seismic calculations may require significant labor and material costs. Assuming a moderate-sized project, the budget could range from $200,000 to $500,000. Factors that may influence the budget include the complexity of the design, the materials used, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City and County of San Francisco·California

Top match · 71%

EXT DPW | Ingleside Police Stn Repl Trade Package

Closes 10/9/2030Opened 10/9/2025

City and County of San Francisco·California

71% match

EXT DPW | SFFD DOT Project - CM/GC: Trade Package

Closes 7/7/2028Opened 7/7/2025

El Paso Water·Texas

69% match

Northeast Water & Wastewater Utility Improvements Program – Work Package 1, 3, 4, & 6

Closes 11/13/2026Opened 10/26/2026

California Grants·California

69% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

California Grants·California

69% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

City of Hollywood·Florida

69% match

Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)

Closes 11/18/2026Opened 9/9/2026

California Grants·California

69% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

Santa Clara Valley Water District·California

68% match

San Francisco Intertie Valves and Joints

Closes 11/12/2026Opened 8/18/2026

Riverside Transit Agency·California

68% match

Deionized Water Services

Closes 11/19/2026Opened 10/29/2026

The City of Columbus·Ohio

68% match

RFQ033956 - S&DJP - Thermal Limt Switch

Closes 11/3/2026Opened 10/28/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City and County of San Francisco·California

68% match

EXT DPW | CM/GC Powell St Imprv Prjt Trade Package

Closes 5/26/2029Opened 9/23/2026

San Antonio Water System·Texas

67% match

CLEANOUT SEWER LATERAL PLASTIC 6 INCH

Closes 11/2/2026Opened 10/22/2026

City of Idaho Falls·Idaho

67% match

Water Division Inventory Replenishment

Closes 11/2/2026Opened 10/13/2026

Health, NYS Dept. of·New York

67% match

Drinking Water Fluoridation – Rolling Submissions - Component A: Planning and Feasibility Projects (DOH01-DWFAR-2023) - Component B: Implementation and Maintenance Projects - (DOH01-DWFBR-2023)

Closes 9/28/2028Opened 12/21/2022

NYC Department of Environmental Protection (NYCDEP)·New York

67% match

R156-RO2-DB Upgrade of the Main Sewage Pump and Power Distribution Systems at the Rockaway Wastewater Resource Recovery Facility

Closes 11/20/2026Opened 10/13/2026

U.S. Department Of The Interior·California

67% match

CA-SAN LUIS NWR-FIRE SYSTEM REHAB

Closes 11/30/2026Opened 10/29/2026

NYSERDA·New York

67% match

Clean Heat for All: Packaged Terminal Heat Pump Program - Phase II

Closes 6/30/2027Opened 10/10/2025

City of Cleveland·Ohio

67% match

118-26 - Curb Stop Boxes

Closes 11/18/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

67% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of San Jose·California

67% match

Cast Iron Sewer Replacement FY 2025-2026 Package I

Closes 11/12/2026Opened 10/14/2026

San Jacinto College·Texas

67% match

SJC Quote 27-006 Reverse Water System Services

Closes 11/3/2026Opened 10/15/2026

South Coast Air Quality Management District·California

67% match

Cargo Handling Equipment, Locomotives, Ships at Berth Emissions Capture and Control Systems, and Transport Refrigeration Units Proposition 1B - Goods Movement Emission Reduction Program

Closes 11/20/2026Opened 9/8/2026

City of San Bernardino·California

67% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

LA Water & Power·California

67% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026