The City and County of San Francisco, via its Department of Public Works, is soliciting trade‑package bids for the new San Francisco Fire Department Division of Training (SFFD DOT) campus. The project will replace existing training facilities with a state‑of‑the‑art 8‑acre campus comprising roughly 12 primary buildings (≈ 147,531 gross sf) that include occupied office/classroom structures, unoccupied simulated training buildings, and shared campus spaces. Swinerton is the managing contractor; all subcontractors must pre‑qualify through Swinerton’s portal and will enter into a Master Service Agreement and Project Labor Agreement. The solicitation is organized into numbered bid packages covering trades such as piling, elevators, earthwork, HVAC, electrical, fire‑suppression, structural steel, concrete finishes, glazing, doors, flooring, thermal liners, site paving, and landscaping. The overall procurement window runs from July 2025 through July 2028, with individual package deadlines announced on the BuildingConnected portal.
• Scope: Full construction‑manager/general‑contractor (CM/GC) delivery of a large institutional fire‑training campus (≈ 147k sf).
• Trade Packages: Over 30 distinct packages (e.g., piles, elevators, earthwork, HVAC, electrical, structural steel, tile, glazing, fencing, thermal liners).
• Prerequisites: Sub‑contractor pre‑qualification via Swinerton, execution of a Master Service Agreement, and compliance with the Project Labor Agreement.
• Location: 1200‑1298 Carroll Avenue, Hunters Point/Bayview, San Francisco, CA.
• Timeline: Solicitation opened 07 July 2025; final closing 07 July 2028; individual package bid dates released throughout 2025‑2026.