The Ohio Department of Natural Resources is soliciting bids for the rehabilitation of the Caesar Creek Bridge located in Clinton County, Ohio. The project encompasses a comprehensive set of civil‑engineering tasks ranging from demolition and site preparation to structural repairs and final surfacing. The solicitation provides a lump‑sum schedule for major contract items and a detailed unit‑cost schedule for numerous line items such as curb removal, excavation, embankment, tree removal, soil replacement, seeding, erosion control, pavement repair, and steel sheet piling. Bidders must submit both an electronic bid guaranty (scanned) and an original hard‑copy guarantee within three business days after the deadline. The contract is expected to be completed by February 12, 2027.
• Scope includes clearing & grubbing, guardrail rebuild, traffic control, cofferdams, excavation bracing, and mobilization (6 lump‑sum items).
• Detailed unit‑cost items (16 line items) cover curb removal (50 ft), excavation (15 cy), embankment (15 cy), tree removal (24 each), topsoil, seeding, erosion control mats, pavement repair, steel sheet piling (485 sf), joint seal, and more.
• Project location: Clinton County, Ohio (latitude 39.4149, longitude ‑83.8084).
• Bid deadline: 05/21/2026 02:00 PM EDT; electronic and original bid guarantees required.
• Contract completion date: February 12, 2027, indicating a roughly 9‑month project duration.