Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Engineering Services
  5. ›Engineering Services for the Chicago Avenue Projects

The Village of Oak Park·Illinois

Engineering Services for the Chicago Avenue Projects

Closes 2/27/2026$800k – $1.2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Village of Oak Park is seeking a qualified engineering consultant (or team) to provide Phase I/II design services for the Chicago Avenue Corridor improvements, encompassing streetscape design, Vision Zero safety upgrades, protected bike‑lane extensions, and water‑main replacement. The work will be performed under a Qualifications‑Based Selection (QBS) process, requiring IDOT pre‑qualification and coordination with a landscape‑architecture sub‑consultant (Planning Resources, Inc.). Deliverables include data collection, surveys, environmental reviews, safety and parking studies, conceptual and detailed design packages, public‑outreach planning, and coordination with multiple agencies (IDOT, MWRD, IEPA). The design budget is $1.16 M, with an anticipated start in early May 2026 and construction phases slated for 2027‑2028. • Scope covers transportation engineering, utility design, public‑outreach, and agency coordination for a multi‑year streetscape and infrastructure project. • Must be IDOT‑pre‑qualified in highways, safety, and traffic‑study categories; ability to work with a landscape‑architecture sub‑consultant is required. • Submission deadline is Feb 27 2026; award expected Apr 21 2026; design services budget $1.16 M.

Attached files

Contact

Christopher Welch

[email protected]

Key dates

Opened
2/11/2026
Questions due
2/20/2026
Closes
2/27/2026
Projected award
4/21/2026
Duration
2 years

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQ 2026‑02‑11

Budget estimate

$800,000 – $1,200,000

The RFQ specifies a total design budget of $1,160,000. Since the contract is for the full scope of design services, the awarded firm’s fee is expected to be close to this amount, typically ranging from 70% to 100% of the budget depending on the firm’s pricing strategy, overhead, and any retained sub‑consultant fees. A reasonable estimate therefore falls between $800,000 (conservative, allowing for sub‑consultant costs) and $1,200,000 (full budget capture).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of East Windsor·Connecticut

Top match · 71%

Architectural & Engineering Services

Closes 11/13/2026Opened 10/22/2026

U.S. Department Of Defense·Illinois

71% match

Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois

Closes 11/27/2026Opened 10/27/2026

City of Elgin·Illinois

71% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

Chicago Park District·Illinois

70% match

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURE AND ENGINEERING SERVICES

Closes 12/31/2027Opened 12/15/2022

City of Elgin·Illinois

69% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Ontario·California

69% match

Engineering Design Services for the Turner Avenue Storm Drain and Street Improvement Project (SM2701)

Closes 11/12/2026Opened 10/15/2026

City of Chicago·Illinois

69% match

Vehicle Safety Inspection Testing Services

Closes 11/20/2026Opened 10/2/2026

City of Cedar Rapids·Iowa

68% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

City of Moline·Illinois

68% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

City of Thornton·Colorado

68% match

Quebec Street Widening - North of 136th Avenue

Closes 11/20/2026Opened 10/1/2026

City of Chicago·Illinois

68% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Lake Oswego·Oregon

68% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 11/5/2026Opened 9/29/2026

City of Chicago·Illinois

68% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

City of Billings·Montana

68% match

W.O. 27-23: Grand Avenue – Billings – 41st Street to 62nd Street

Closes 11/20/2026Opened 10/22/2026

City of Cedar Rapids·Iowa

68% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Park Ridge·Illinois

68% match

FIRE STATION 36 ENGINEERING DESIGN SERVICES

Closes 11/5/2026Opened 9/30/2026

Municipality of Anchorage·Alaska

67% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Oakland Park·Florida

67% match

Professional Planning and Engineering Consulting Services for NE 36th Street Railroad Crossing Elimination (RCE) Project

Closes 12/3/2026Opened 10/27/2026

Illinois THA - Toll Highway Authority·Illinois

67% match

I-25-4767 Elgin O'hare (I-490) Roadway/Bridge Construction Taft Ave to Beeline Dr MP 0.9 to MP 2.8

Closes 11/20/2026Opened 10/2/2026

City of Columbia·Missouri

67% match

Enginering Services: Highway Safety Manual Analysis of CATSO Intersections and Roadways

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Illinois

67% match

FLOSSMOOR ROAD VIADUCT STORM SEWER IMPROVEMENTS, FLOSSMOOR, COOK COUNTY, ILLINOIS

Closes 10/15/2035Opened 10/15/2025

City of Lake City and City of Bellechester·Minnesota

67% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Northeastern Illinois University·Illinois

67% match

Invitation for Construction Bid: Replace West Side Back-up Generators

Closes 11/19/2026Opened 10/19/2026

University of Illinois at Chicago·Illinois

67% match

Invitation for Construction Bid: Replace West Side Back-up Generators

Closes 11/19/2026Opened 10/19/2026

City of Vernon·California

67% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026