Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›N Ave Traffic Circles (Non-PLA)

City of National City·California

N Ave Traffic Circles (Non-PLA)

Closes 4/30/2026$260k – $390kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of National City is soliciting bids for the design‑build construction of new traffic circles on N Ave. The work encompasses full demolition of existing pavement and curb, grading, installation of concrete traffic circles, new curb and gutter, sidewalks, cross‑gutters, striping, signage, and associated traffic‑control devices. The contractor must also coordinate utility adjustments, provide temporary traffic control, protect and relocate existing utilities as required, and restore all disturbed areas to pre‑construction conditions. The project is a 60‑working‑day construction effort valued at approximately $323 K and requires a 10 % bid bond, performance and payment bonds, and compliance with a suite of California‑state certifications (non‑collusion, Iran Contracting Act, economic sanctions, etc.). • Demolition, removal, grading, and subgrade preparation for concrete traffic circles. • Installation of new curb, gutter, sidewalks, cross‑gutters, pavement markings, signage, and traffic‑control devices. • Utility adjustments, temporary traffic management, and site restoration in accordance with municipal specifications. • Mandatory bonding (10 % bid bond, 100 % performance and payment bonds) and multiple compliance certifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Luca Zappiello

[email protected]

(619) 336-4360

Key dates

Opened
4/2/2026
Questions due
4/20/2026
Pre-bid meeting
4/9/2026
Closes
4/30/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
CIP No. 25-08

Budget estimate

$260,000 – $390,000

The bid package lists an estimated project value of $323,153. Assuming typical profit margins for municipal construction (≈8‑12 % net), the contractor’s earnings would likely fall in the $260 K‑$390 K range after covering labor, materials, bonds, and overhead. The final budget could be higher if change orders or additional scope arise, but the baseline estimate is anchored to the stated project value.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 64%

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

62% match

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

Miami-Dade County·Florida

61% match

Traffic Circle at SW 62nd Ave. And SW 48th Street

Closes 12/2/2026Opened 10/23/2026

City of Napa·California

58% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

58% match

Traffic Circle at SW 62nd Ave. And SW 48th Street

Closes 12/2/2026Opened 10/23/2026

City of Ontario·California

58% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Ankeny·Iowa

58% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

Missouri Department of Transportation·Missouri

57% match

St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant Road

Closes 11/18/2026Opened 10/13/2026

City of Charlotte·North Carolina

57% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

57% match

Safe Streets for All (SS4A) Phase 1

Rolling / TBD closeOpened 4/1/2026

City of North Augusta·South Carolina

57% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

City of Pasadena·California

56% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Rancho Cordova·California

56% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

County of Los Angeles Department of Public Works·California

56% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Charlotte·North Carolina

56% match

Blank Out Signs and Traffic Components

Rolling / TBD closeOpened 8/20/2026

City of Columbia·Missouri

56% match

Enginering Services: Highway Safety Manual Analysis of CATSO Intersections and Roadways

Closes 11/20/2026Opened 10/23/2026

City of Bakersfield·California

56% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

City of Rancho Palos Verdes·California

56% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

California Department of Transportation·California

56% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

City of Charlotte·North Carolina

56% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

City of Vernon·California

55% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Tucson·Arizona

55% match

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026

City of Aiken·South Carolina

55% match

P043675 Abbeville Ave and Sumter St & P043676 Colleton St and Charleston Ave Intersection Improvements

Closes 11/17/2026Opened 10/8/2026

Calhoun County Board of County Commissioners·Florida

55% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Charlotte·North Carolina

55% match

Pavement Marking Materials

Rolling / TBD closeOpened 9/1/2026