Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›FY26 Harlingen Placement Area (PA)13 and 10 Improvements

U.S. Department Of Defense·Texas

FY26 Harlingen Placement Area (PA)13 and 10 Improvements

Closes 12/17/2026$1M – $5MRequest for Information
Get bids like this by emailBid source

Description

The U.S. Army Corps of Engineers, Galveston District, is seeking information from industry for the construction of improvements to the Harlingen Placement Area (PA)13 and 10. The work consists of a 3-foot raise, inlet structure installation, and shoreline protection feature for PA 13, as well as optional work for PA 10, including clearing/grubbing, minor dike repairs, inlet structure repairs, and a splash pad. The project requires specialized experience and technical competence in Dredged Material Placement Areas construction. Interested firms should demonstrate their capability to perform the work outlined in the project information section. The estimated construction price range for this project is between $1,000,000 and $5,000,000. Key points to consider: • The project requires a 3-foot raise, inlet structure installation, and shoreline protection feature for PA 13 • Optional work for PA 10 includes clearing/grubbing, minor dike repairs, inlet structure repairs, and a splash pad • The project requires specialized experience and technical competence in Dredged Material Placement Areas construction • The estimated construction price range is between $1,000,000 and $5,000,000 • The project duration is 190 calendar days

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Wes Baskovic

[email protected]

Key dates

Opened
12/3/2025
Closes
12/17/2026
Projected award
9/25/2026
Duration
190 days

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
237990
Solicitation №
W912HY-26-S-1AX4

Budget estimate

$1,000,000 – $5,000,000

The estimated construction price range for this project is between $1,000,000 and $5,000,000. This range is likely due to the varying scope of work, including the optional items for PA 10. The actual budget may be higher or lower, depending on the complexity of the work, the materials required, and the labor costs. Factors that may influence the likely payment range include the contractor's experience, the availability of materials, and the weather conditions during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Texas

Top match · 92%

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

U.S. Department Of Defense·Virginia

83% match

Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia

Closes 12/1/2026Opened 11/10/2025

U.S. Department Of Defense·Texas

82% match

FY27 Texas City Ship Channel Main Channel and Turning Basin

Closes 11/7/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

81% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·South Carolina

81% match

AIWW Shoreline Protection Placement Areas

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·Texas

80% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Defense·Michigan

80% match

South Haven and New Buffalo Maintenance Dredging

Closes 11/24/2026Opened 11/24/2025

U.S. Department Of Defense·Texas

80% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 8/31/2026

U.S. Department Of Defense·Georgia

79% match

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Virginia

79% match

Fort Eustis Dredge Material Management Area (FEDMMA)

Closes 12/1/2026Opened 9/23/2026

U.S. Department Of Defense·Louisiana

79% match

Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA

Closes 4/7/2028Opened 3/23/2026

U.S. Department Of Defense·Georgia

79% match

Tybee Island Shoreline Protection Project

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·Minnesota

79% match

Duluth Vessel Yard Phase III Repairs

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

79% match

Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX

Closes 11/20/2026Opened 10/7/2026

U.S. Department Of Defense·Texas

78% match

Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging

Closes 11/3/2026Opened 9/28/2026

Western Municipal Water District·California

78% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·Pennsylvania

78% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

78% match

Levee Repair at MRLS L246

Closes 5/28/2027Opened 5/28/2026

U.S. Department Of Defense·North Carolina

78% match

Philpott Anchors and Instrumentation Construction

Closes 1/21/2029Opened 12/22/2025

U.S. Department Of Defense·Missouri

78% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

U.S. Department Of Defense·Louisiana

78% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·South Carolina

78% match

FY26 Clouter Creek Middle and Highway Cell Diking

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Defense·Missouri

78% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

U.S. Department Of Defense·United States of America

78% match

Pre Solicitation Notice: FY27 Maintenance Dredging Yokohama North Dock

Closes 11/15/2026Opened 7/10/2026

Imperial Irrigation District·California

78% match

Clubhouse Bale Expansion Project

Closes 11/3/2026Opened 9/22/2026