The City of Smithville is seeking a design‑build contractor to construct a single‑lane roundabout at the intersection of Bridge Street, 1st Street, and Hilltop Street. The work includes full‑depth asphalt and concrete road construction, milling and overlay of existing pavement, installation of pedestrian sidewalks and curb ramps, and necessary drainage and storm‑sewer improvements. This project will replace the existing intersection with a modern roundabout to improve traffic flow and safety.
• Design‑build delivery for a single‑lane roundabout (roadway, pavement, and drainage).
• Full‑depth asphalt and concrete construction, plus mill‑and‑overlay of existing surfaces.
• Pedestrian facilities (sidewalks, curb ramps) and storm‑sewer upgrades.
• Bid bond required (≥ 5 % of proposed price) from a bank/trust in Clay or Jackson County, MO.
Attached files
Similar opportunities
Matched by Bid Banana AI™
Bid Banana · 1.6M+ bids and awards 🍌
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.