Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›27th Street Viaduct Expansion Joint Replacement

City of Milwaukee·Wisconsin

27th Street Viaduct Expansion Joint Replacement

Closes 6/4/2026$2M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Milwaukee is soliciting sealed bids for the replacement of expansion joints on the 27th Street Viaduct, a bridge structure located at 500 South 27th Street. The scope includes demolition, concrete removal, installation of new expansion devices, protective treatments, bearing assemblies, joint repair, and associated roadway and drainage work. The project also requires compliance with city‑mandated Small Business Enterprise (SBE) and Residents Preference Program provisions, as well as submission of electronic bid bonds and required bid security. The contract will be awarded to the lowest responsive bidder meeting all technical specifications and mandatory requirements. • Demolition and removal of existing concrete and bridge components (approx. 180 SY). • Installation of 78 LF of new expansion devices, protective surface treatments, and bearing assemblies. • Comprehensive concrete pavement, curb, and sidewalk work, plus site‑specific marking and drainage improvements. • Mandatory SBE participation (0 % required for this project) and resident‑preference labor utilization; electronic bid submission required.

Attached files

Contact

Jackie Medina(Commissioner of Public Works)

(414) 286-3314

Key dates

Opened
5/8/2026
Closes
6/4/2026
Duration
5 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
OFFICIAL NOTICE 61-1-2026

Budget estimate

$2,000,000 – $5,000,000

No explicit contract value is listed. Based on the extensive item list (over 30 line items, quantities totaling several hundred linear feet and square yards) and typical market rates for bridge rehabilitation in the Midwest, a reasonable estimate for the total award is between $2 million and $5 million. Lower bound assumes modest unit prices and limited ancillary work; upper bound reflects higher material costs, specialized steel reinforcement, and labor rates for certified contractors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Oregon Department of Transportation·Oregon

Top match · 68%

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Port of Portland·Oregon

67% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of St. Louis·Missouri

66% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Illinois Tollway·Illinois

66% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

City of St. Louis Board of Public Service·Missouri

65% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

U.S. Department Of Homeland Security·Maryland

65% match

Expansion Joints

Closes 11/6/2026Opened 10/21/2026

City of Cincinnati·Ohio

64% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

Niagara Frontier Transit Authority (NFTA)·New York

64% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

City of Fargo·North Dakota

64% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Washington DC Transportation (DDOT)·District of Columbia

64% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

Town of Pulaski·Virginia

64% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Illinois THA - Toll Highway Authority·Illinois

64% match

RR-25-6002 - CO #1 - ATP #4 - Systemwide Pavement Repairs

Closes 11/26/2026Opened 10/28/2026

City of Cincinnati·Ohio

64% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

City of Prior Lake·Minnesota

64% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026

New York City Department of Design and Construction·New York

64% match

HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Caddo Parish Commission·Louisiana

63% match

26-17, Mira Myrtis Road Bridge Replacement Project

Closes 11/12/2026Opened 10/21/2026

City of Indianapolis·Indiana

63% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

Nyc Department of Design and Construction·New York

63% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Fort Wayne·Indiana

63% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Carver County·Minnesota

63% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

62% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

LA Public Works Engineering Bureau·California

62% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026