The City of Milwaukee is soliciting sealed bids for a comprehensive infrastructure improvement at three locations on West Mt. Vernon Avenue (825, 907, and 1025). The work covers extensive road and utility removal, soil excavation and replacement, and ancillary landscaping and street‑lighting upgrades, with a required completion date of May 1 2027.
• Mobilization, site clearing, barricading, and tree removal.
• Full‑depth roadway, curb, gutter, and pavement demolition and replacement (including concrete, asphalt, and base material).
• Utility adjustments: manhole/inlet modifications, conduit installation, and street‑lighting infrastructure (transformer bases, luminaires, wiring).
• Soil excavation, transport of 13,715 tons of material, and clean‑soil cap placement.
• Landscaping components: tree planting, mulch, turf‑seed mixes, and soil preparation.