The State of Michigan is seeking bids for the replacement of 10 entry door storefront systems at the Ionia Correctional Facility. The existing doors are heavily worn and salt damaged, and the new doors will contain electrified hardware and some minor alarm routing work. The project requires the bidder to figure their base bid on the specified materials and equipment only, with no substitutions or "or equal" proposals permitted after bid opening. The bidder must also provide a performance bond and a payment bond, and must comply with all applicable laws and regulations, including those related to asbestos abatement and environmental protection. The project is expected to take 210 days to complete, and the bidder must ensure that all subcontractors have a current state project registration in compliance with PA10 of 2023, as amended in PA110 of 2024. Some key points to consider for this project include:
• Replacement of 10 entry door storefront systems
• Existing doors are heavily worn and salt damaged
• New doors will contain electrified hardware and minor alarm routing work
• Base bid must be figured on specified materials and equipment only
• Performance bond and payment bond are required
• Compliance with all applicable laws and regulations is required
• Project duration is 210 days
• Subcontractors must have a current state project registration