Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Civil Engineering
  5. ›ITB Cub Creek Phase 3 Stream Restoration

North Carolina Town of Wilkesboro·North Carolina

ITB Cub Creek Phase 3 Stream Restoration

Closes 10/19/2026$900k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Wilkesboro is issuing a sealed‑bid Invitation to Bid (ITB) for Phase III of the Cub Creek Stream Restoration project. The work involves restoring approximately 3,840 linear feet (≈0.73 mi) of Cub Creek, including clearing/grubbing, grading, stream excavation, installation of in‑stream structures (stone, boulders, pipe removal/replacement), erosion control measures (geotextile, silt fences), and riparian planting. The project is funded with Federal ARPA State and Local Fiscal Recovery Funds administered by NC DEQ. Bids must be submitted sealed by 10 a.m. EST on 19 Oct 2026, with a mandatory pre‑bid meeting on 28 Sep 2026. The award will be based on the lowest responsive, responsible bid that meets specifications. The contractor must comply with federal ARPA requirements, provide certifications (E‑Verify, debarment, lobbying, etc.), and may be required to handle optional unloading fees. • Location: Cub Creek, approx. 5–6 mi downstream of W. Kerr Scott Dam, Wilkes County, NC • Scope: Earthwork, stream channel reconstruction, structural installations, erosion control, planting, and related surveying • Funding: Federal ARPA SLFRF (federal‑funded, with strict reporting) • Submission: Sealed bids to Town Hall, 203 West Main St., Wilkesboro, NC, by 10 a.m. EST 19 Oct 2026 • Pre‑bid: Mandatory meeting 28 Sep 2026, 2 p.m. EST, Town Hall Conference Room • Evaluation: Lowest responsive, responsible bid; award may be split among vendors • Required certifications: E‑Verify, conflict‑of‑interest, debarment, lobbying, etc.

Attached files

Contact

Justin Church

[email protected]

(336) 844-4088

Key dates

Opened
9/14/2026
Questions due
10/5/2026
Pre-bid meeting
9/28/2026Mandatory
Closes
10/19/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
699-SRP-SW-ARP-0025-03

Budget estimate

$900,000 – $1,500,000

Based on typical costs for stream restoration (earthwork, structural stone, pipe replacement, erosion control fabrics, and extensive planting) in North Carolina, a project of roughly 3,840 ft can range from $1 million to $1.5 million. Factors influencing the final amount include material quantities (stone, geotextile, pipe), site access constraints, mobilization costs, and any optional unloading services. Federal ARPA funding may cover a substantial portion, but the contractor’s fee will reflect labor, equipment, materials, overhead, and a reasonable profit margin.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

North Carolina County of Mecklenburg·North Carolina

Top match · 70%

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

68% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Santa Clara Valley Water District·California

66% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

City of Fitchburg·Wisconsin

66% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Town of Honea Path·South Carolina

65% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of El Cajon·California

65% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

Santa Clara Valley Water District·California

65% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Greenville County·South Carolina

65% match

Huff Creek Watershed Reservoir Maintenance

Closes 11/20/2026Opened 10/30/2026

St. Louis County, MN - Purchasing Division·Minnesota

65% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

California Grants·California

64% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Austin·Texas

64% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

64% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·Illinois

64% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

Greenville County·South Carolina

64% match

HUFF CREEK WATERSHED RESERVOIR MAINTENANCE

Closes 11/20/2026Opened 10/30/2026

Kenosha County·Wisconsin

64% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

North Carolina Department of Environmental Quality·North Carolina

63% match

2026 Catawba Expanded Service Area (ESA) Warm Stream and Riparian Wetland Full Delivery Projects

Closes 2/23/2027Opened 6/23/2026

California Grants·California

63% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

Washakie County Conservation District·Wyoming

63% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Oregon Wasco County Soil & Water Conservation District·Oregon

63% match

Contractor pool for fuels reduction and habitat restoration

Closes 11/30/2026Opened 10/28/2026

The University of North Carolina·North Carolina

63% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Laramie Rivers Conservation District·Wyoming

63% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Gwinnett County Government·Georgia

63% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Town of Jupiter·Florida

63% match

Sims Creek Preserve

Closes 11/4/2026Opened 9/22/2026