Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›POWERTRAIN PHASE IV CTC – ADMIN ANNEX EXPANSION, CORPUS…

U.S. Department Of Defense·Florida

POWERTRAIN PHASE IV CTC – ADMIN ANNEX EXPANSION, CORPUS CHRISTI ARMY DEPOT (CCAD), NAVAL AIR STATION (NAS) CORPUS CHRISTI, TEXAS

Closes 8/4/2026$25M – $100MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Naval Air Station (NAS) Corpus Christi is seeking sources for a design-bid-build construction project to expand the Powertrain Phase IV CTC – Admin Annex at the Corpus Christi Army Depot (CCAD). The project involves constructing a 68,000 square foot, multi-story office building with various features such as utilities, data and telecommunications, and audio-visual systems. The building must meet High Performance Sustainable Building Guiding Principles, including Third Party Certification. The period of performance is anticipated to be approximately 18 months, and the construction magnitude is between $25,000,000 and $100,000,000. • The project requires a firm-fixed price contract. • The NAICS code for this project is 236220, Commercial and Institutional Building Construction. • The annual size standard for this project is $45.0 million. • The Product Service Code (PSC) is Y1AA, Construction of Office Buildings. • The contractor must have experience with similar projects, including military projects or buildings inside facilities with similar security and restrictions. • The contractor must provide at least one construction project meeting the requirements set forth in the announcement, demonstrating their ability to complete all necessary pre-construction submittals and mobilize within 60 days of contract award.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Aimee Johnson

[email protected]

Key dates

Opened
7/28/2026
Closes
8/4/2026
Duration
18 months

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236220
Solicitation №
N6945026RCCAD

Budget estimate

$25,000,000 – $100,000,000

Based on the construction magnitude provided in the document, which is between $25,000,000 and $100,000,000, it can be estimated that the budget for this project will likely fall within this range. The actual budget may be influenced by factors such as the complexity of the project, the experience and qualifications of the contractor, and the level of competition for the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Texas

Top match · 73%

Government-Owned, Contractor-Operated (GOCO) fuel services at Naval Air Station Corpus Christi, TX

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·Texas

71% match

Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)

Closes 9/30/2027Opened 10/5/2026

Columbus State Community College·Ohio

71% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

70% match

KC-135 Center Console Refresh (CCR) Revision 2

Closes 11/9/2026Opened 7/2/2025

U.S. Department Of Defense·Texas

70% match

Renovate Building 516 at Fort Bliss, Texas

Closes 11/12/2026Opened 10/26/2026

Texas Military Department·Texas

70% match

Lubbock Readiness Center Major Maintenance STAR

Closes 3/9/2027Opened 10/29/2026

U.S. Department Of Defense·Michigan

70% match

Common Tactical Truck (CTT) Commercial Solutions Opening (CSO)

Closes 3/19/2030Opened 3/19/2026

U.S. Department Of Veterans Affairs·Texas

70% match

CTX ARMORED CAR SERVICES

Closes 11/10/2026Opened 10/31/2026

U.S. Department Of Defense·Alabama

69% match

U.S. Army Contracting Command – Anniston Army Depot (CCTA-HDA) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)

Closes 5/18/2030Opened 5/19/2025

U.S. Department Of Defense·Pennsylvania

69% match

TEARDOWN, EVALUATE, REPAIR AND MODIFY POWER SUPPLY

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Defense·Michigan

69% match

Ground Vehicle System Center (GVSC) Commercial Solutions Opening (CSO)

Closes 6/4/2029Opened 6/5/2024

U.S. Department Of Defense·Texas

69% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

69% match

Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot

Closes 11/13/2026Opened 10/18/2026

U.S. Department Of Defense·North Carolina

69% match

MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)

Closes 11/5/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

68% match

CCA,COMPUTER

Closes 12/18/2026Opened 10/6/2026

U.S. Department Of Defense·Texas

68% match

Joint Cyber Command and Control - ANTICIPATED ACQUISITIONS - UPDATE MAY 2026

Closes 12/30/2027Opened 9/17/2025

U.S. Department Of Defense·Texas

68% match

Pilot Training Transformation Device Support Services IV (PTT DSS IV)

Closes 11/25/2026Opened 10/28/2026

U.S. Department Of Defense·District of Columbia

68% match

NAVFAC Special Notice of FY 2027 Industrialized Construction Projects for Barracks and Child Development Centers via Other Transaction Authority (10 USC 2808a)

Closes 1/1/2027Opened 7/1/2026

U.S. Department Of Defense·Texas

68% match

Fort Bliss Air Traffic Control Services

Closes 11/11/2026Opened 9/30/2026

U.S. Department Of Defense·Florida

68% match

Planned Maintenance Interval (PMI) for E-6B

Closes 11/12/2026Opened 10/28/2026

Texas Comptroller Of Public Accounts·Texas

68% match

Heavy Trucks

Closes 12/2/2026Opened 9/4/2026