Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Civil Engineering
  5. ›Bluff Drive Improvement Project

NYS East Rochester, Town/Village of·New York

Bluff Drive Improvement Project

Closes 3/25/2026$150k – $250kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Project: Preliminary and Final Design to provide safety improvements on Bluff Drive to decrease roadway departures causing crashes. NOTICE HEREBY GIVEN that the Town/Village of East Rochester is seeking to retain an engineering firm to provide preliminary and final design and construction observation services for NYS Roadway Departure Safety Action Plan funding (RwDSAP) project located in the Town/Village of Eater Rochester, Monroe County, Pin: 4761.55 and contract number . The project involves the analysis of Bluff Drive between Lindon Avenue and Despatch Drive as it relates to the significant number of automobile crashes. Preliminary Design will include, but not be limited to, preparation of the Design Approval documents which include mapping, evaluation of costs, preparation of preliminary design, and presentation at a public information meeting. Final Design will include, but not be limited to, the design of safety countermeasure improvements, maintenance and protection of traffic during construction, the preparation and submission of the final Plans, Specifications and Estimate for the project. Construction Support will include, but not be limited to, providing technical support during construction, addressing questions relating to the design, providing assistance in construction bid proceedings, analysis of bids, and review of shop drawings, if necessary. Construction Observation will include, but not be limited to, providing on-site construction observation and oversight to ensure the quality of construction and conformity with the final plans and specifications. A record drawing will also be required. The anticipated start date of Preliminary Design is June 2026, with the letting expected to be held in September 2026 and construction completed by June 2027. The anticipated construction cost is approximately $195,000. The Town/Village of East Rochester will select the most highly qualified firm according to the following criteria, listed in order of decreasing importance: Understanding of Work to be Done 25% Logistics and Familiarity with Project Area 25% Experience with Similar kinds of projects 20% Quality of the Staff for the Work to be done 15% Familiarity with Federal and State Requirements 15% 100% EXPRESSION OF INTEREST (EOI) Interested firms must submit three (3) copies of the Expression of Interest (EOI) to the address below no later than March 20, 2026, by 4:00 PM. The EOI shall consist of the GSA Standard Form SF330. In no case, must the number of additional pages exceed 10. All pages to be one sided. If more than 10 pages are included, those beyond the 10th page will be removed. Under Section H of the SF330 Form, the firm may include a brief description of the proposed project approach and schedule may be included in this section. Statements that address selection criteria to be used to evaluate the submission, but are not covered by the information requested in other sections of the SF330 should also be included in the section. Proposal Due: March 20, 2026 Contract Term: 12 months Project Location: Bluff Drive in the Town/Village of East Rochester, Monroe County Contact: Shelby E. Simmons, Clerk/Treasurer Town/Village of East Rochester 317 Main Street, Suite 2000 East Rochester, New York 14445 Phone: 585-586-3553 Email Address: [email protected] Submit to: Martin G. D’Ambrose, Town/Village Administrator Town/Village of East Rochester 317 Main Street, Suite 2000 East Rochester, New York 14445 Phone: 585-586-3553 Email Address: [email protected] Business enterprises awarded an identical or substantially similar procurement contract within the past five years: MRB Group

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Shelby E. Simmons(Clerk/Treasurer)

[email protected]

(585) 586-3553

Key dates

Opened
3/4/2026
Closes
3/25/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
TBD

Budget estimate

$150,000 – $250,000

Based on the project description, the budget for this opportunity is estimated to be around $195,000, which is the anticipated construction cost. This estimate is based on the project's scope, which includes design and construction services for the Bluff Drive Improvement Project. The actual budget may vary depending on the selected firm's proposal and the Town/Village of East Rochester's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Bluffton·South Carolina

Top match · 70%

Holly Hill Lane Road Extension IFB

Closes 11/24/2026Opened 10/21/2026

County of San Luis Obispo·California

68% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

Town of Bluffton·South Carolina

68% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Lexington County·South Carolina

68% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

Mississippi Department of Finance and Administration·Mississippi

67% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

Berkeley County·South Carolina

67% match

Paslay Drive Right-Of-Way Improvements

Closes 11/30/2026Opened 10/27/2026

Nevada Government·Nevada

67% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Bluewing Civil Consultants, LLC.·Louisiana

67% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

North Carolina Town of Knightdale·North Carolina

66% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

66% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

Mississippi MS Department of Finance and Administration·Mississippi

66% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

City of San Antonio·Texas

66% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of The Interior·Colorado

66% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

City of Doge City·Kansas

66% match

Red Demon Drive Improvements (due 11/03 @ 1:45pm)

Rolling / TBD closeOpened 9/25/2026

City of Charlotte·North Carolina

66% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Cedar Rapids·Iowa

66% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Idaho Transportation Department·Idaho

66% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Riverside·California

66% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Monroe County·New York

66% match

RFP - County Highway Improvement Projects

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Transportation·Colorado

66% match

TX FW LGA 10(5) Steve Thompson Wildlife Drive

Closes 11/3/2026Opened 10/1/2026

Harris County Municipal Utility District No. 538·Texas

66% match

FM 529 Turn Lane, Traffic Signalization, and Driveway

Closes 11/5/2026Opened 10/20/2026

Trumbull County, OH·Ohio

65% match

TRU-GENESE AVENUE/ ELM ROAD INTERSECTION IMPROVEMENTS

Closes 11/23/2026Opened 10/30/2026

Charleston County·South Carolina

65% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

Roanoke City Government·Virginia

65% match

SOL1342, Wiley Drive Low Water Bridge Replacement

Closes 11/4/2026Opened 9/23/2026