The project involves the installation of a ductless split HVAC system at the Newark Liberty International Airport, including mechanical, electrical, structural, and controls-related tasks. The system consists of one exterior-mounted 6-ton heat pump unit and three interior wall-mounted units. The contractor will be responsible for installing all refrigerant and condensate piping, dedicated 208V/3-phase power circuit, and BACnet integration with the existing FAA Building Automation System. The project also includes interior patching and finish repair.
• Installation of (3) indoor wall-mounted units and (1) 6-ton heat pump unit
• Dedicated 208V/3-phase power circuit and NEMA 4X stainless steel disconnect
• BACnet integration with existing FAA Building Automation System
• Structural steel support framing and wall-mounted backing plates
• Interior patching and finish repair
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.