Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›East Lynches River Fire Substation

Darlington County·South Carolina

East Lynches River Fire Substation

Closes 9/25/2026$250k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Darlington is seeking sealed, competitive bids to construct a prefabricated metal, single‑bay fire station measuring approximately 20 × 50 feet on East Lynches River Road in Lamar, SC. The project requires a contractor capable of delivering a complete building that meets fire‑department specifications and local building codes. • Scope includes design, fabrication, delivery, and installation of a 1,000 sq ft metal fire station structure. • Contractor must provide all labor, materials, site preparation, and final commissioning. • Bids are due September 25, 2026 at 1:00 pm; all proposals must be sealed and submitted to Darlington County purchasing office. • All required documents and specifications are available via the county’s purchasing website. • The project is a readvertised CDBG‑funded opportunity (Project No. 4‑CE‑24‑003).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Barry Odom(Project Coordinator)

[email protected]

(843) 398-4100

Key dates

Opened
8/18/2026
Closes
9/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
CDBG # 4-CE-24-003 (Readvertised)

Budget estimate

$250,000 – $500,000

Based on the size (≈1,000 sq ft) and the fact that the project involves a prefabricated metal structure, typical costs range from $200–$400 per square foot for similar municipal fire‑station builds, plus site‑work and commissioning. This suggests a contract value roughly between $250,000 and $500,000. Factors influencing the final amount include local labor rates, foundation conditions, finish‑out requirements, and any additional fire‑equipment integration.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lynchburg·Virginia

Top match · 65%

LYNCHBURG FIRE STATION 1 RENOVATION

Closes 11/17/2026Opened 10/20/2026

City of Charlotte·North Carolina

64% match

Firehouse 44

Rolling / TBD closeOpened 1/1/2026

Lewis County·Washington

63% match

Fire Alarm engineering for Lewis County

Closes 11/10/2026Opened 10/6/2026

Mississippi MS Department of Finance and Administration·Mississippi

63% match

Campus Fire Alarm – South Mississippi Regional Center (ESS)

Closes 11/19/2026Opened 10/20/2026

Maryland Transit Administration·Maryland

62% match

Metro Traction Power Substation Emergency Trip Stations (TPSS ETS) Installation at Various Locations [T-1564-0150]

Closes 11/19/2026Opened 10/1/2026

El Paso ISD·Texas

62% match

Districtwide Fire Suppression Replacement, Maintenance, and Repair

Closes 11/12/2026Opened 10/20/2026

City of Lynchburg·Virginia

61% match

2027-026 LYNCHBURG FIRE STATION 1 RENOVATION

Closes 11/17/2026Opened 10/20/2026

Clark County·Nevada

61% match

Fire Station 71 Bunkerville Emergency Generator Connection

Closes 12/3/2026Opened 10/26/2026

Bedford County·Virginia

61% match

(2027-3) IFB: HYBRID FIRE EXTINGUISHING SYSTEM INSTALLATION

Closes 11/9/2026Opened 10/2/2026

City of Rockford·Illinois

60% match

EMERGENCY GENERATOR REPLACEMENT AT FIRE STATION 8 AND NEWBURG RD. TRANSMITTER SITE

Closes 11/12/2026Opened 10/16/2026

Massachusetts Town of Edgartown·Massachusetts

60% match

EFD-27-01 Underground tanks and wells

Closes 11/18/2026Opened 10/27/2026

Nevada State Public Works Division·Nevada

60% match

Fire Sprinkler System Installation and Fire Alarm Upgrades, Walker River State Recreation Area (25‑S03‑3 & 25‑S03‑4)

Closes 11/18/2026Opened 9/29/2026

City of Redlands·California

60% match

REBID: Fire Station 263 Bathroom Remodel

Closes 11/10/2026Opened 10/26/2026

Miami-Dade County Fire Rescue·Florida

60% match

MDFR Fire Station 35 New Four-Fold Xt Exterior Doors

Closes 11/12/2026Opened 10/16/2026

Massachusetts Easthampton Housing Authority·Massachusetts

60% match

Easthampton Fire Alarm (FA) Upgrade 667-1, 2 & 3

Closes 11/20/2026Opened 10/28/2026

Bedford County·Virginia

60% match

#2027-3 HYBRID FIRE EXTINGUISHING SYSTEM INSTALLATION IFB

Closes 11/9/2026Opened 10/2/2026

The University of Texas Medical Branch·Texas

60% match

RFP 27-002 Inspecting, Testing, Maintenance, and Repair of Fire Safety Systems

Closes 11/2/2026Opened 10/1/2026

Atlantic County Utilities Authority, NJ·New Jersey

60% match

Remote Fire Detection Monitoring and Suppression System for the Recycling Transfer Station

Closes 11/4/2026Opened 10/6/2026

Mississippi Department of Finance and Administration·Mississippi

60% match

Campus Fire Alarm (GS# 425-074)

Closes 11/19/2026Opened 10/20/2026

Town of Dixfield·Maine

60% match

RFP for Fire Station Boiler- Town of Dixfield

Closes 11/20/2026Opened 10/21/2026

Gwinnett County Government·Georgia

59% match

Construction of Gwinnett County Fire Station #14

Closes 11/5/2026Opened 9/23/2026

St. Lucie County - Purchasing Department·Florida

59% match

Fire Extinguisher Services

Closes 11/18/2026Opened 10/18/2026

Massachusetts Town of Belchertown·Massachusetts

59% match

HVAC Upgrades Belchertown Fire Station

Closes 11/13/2026Opened 10/28/2026

Dakota County·Minnesota

59% match

Fire Sprinkler Maintenance

Closes 11/4/2026Opened 10/21/2026

Maryland Montgomery County Government·Maryland

59% match

RFP #1197772 - Construction Services for North Bethesda Fire Station #43

Closes 11/6/2026Opened 10/1/2026