The project calls for the design‑build, construction, installation, testing, and commissioning of a new advanced water‑purification plant and associated brine‑pond facilities to replenish the San Jacinto Valley groundwater basin. The scope covers extensive site grading, civil works, structural concrete, a process building with RO/Uf systems, extensive mechanical equipment, full electrical power and control systems, pipeline installation, brine‑pond liner installation, evaporators, and required studies (short‑circuit, arc‑flash, process‑control integration). The contractor must also meet stringent Buy‑America/Build‑America requirements, prevailing‑wage rules, safety and environmental compliance, and provide warranties and post‑construction support.
• Comprehensive civil, structural, mechanical, electrical, and instrumentation work for a $150‑$160 M water‑treatment facility.
• Mandatory pre‑bid walk‑through and site‑visit, with detailed specifications for pumps, RO trains, brine‑pond evaporators, and fire‑suppression systems.
• Requires 10 % bid bond, 100 % performance/payment bonds, extensive licensing, insurance, and DBE Good‑Faith Efforts documentation.