Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal…

U.S. Department Of Defense·Mississippi

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes in 5 days$500k – $1.5MRequest for Quotation
Get bids like this by emailBid source

Description

This solicitation seeks a vendor to fully rehabilitate the existing water‑well system at Arkabutla Lake and install a new 30 × 50 ft pre‑fabricated metal building to protect a new well. The work includes abandoning the old well, installing AWWA‑compliant plumbing, a Stenner chemical pump, a three‑phase air compressor, sand‑blasting and multi‑coat painting of a pressure tank, and a complete electrical system upgrade (200‑A breakers, LED lighting, outlets, and three‑phase power). All materials, labor, tools, and equipment must be supplied and the project completed within 120 days of award. The contract will be awarded on an unrestricted basis to the lowest‑priced, technically acceptable offer. • Abandon old well and install new AWWA C‑509‑compliant plumbing, pump, and air compressor. • Purchase, deliver, and erect a 30 × 50 ft red‑iron pre‑fabricated building with roll‑up door, walk‑through door, insulation, gutters, and engineered anchor‑bolt plans. • Sand‑blast and apply multiple coating systems (Tnemec, L‑140 epoxy, 1094 urethane) to the existing tank. • Install a new 200‑A electrical distribution system, LED lighting, exterior lighting with photocell, GFCI‑protected outlets, and a three‑phase circuit for the compressor. • Provide all supervision, tools, equipment, and deliver complete work within a 120‑day performance window, including a one‑year limited warranty.

Attached files

Contact

Afton Riles(Contracting Officer)

[email protected]

(601) 631-5813

Key dates

Opened
10/21/2026
Closes
11/6/2026
Duration
120 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
332311
Solicitation №
W912EE27QA002

Budget estimate

$500,000 – $1,500,000

The scope includes a 30 × 50 ft metal building, specialized pump and compressor equipment, extensive plumbing and electrical work, tank sand‑blasting and multi‑coat painting, plus mobilization and labor for a 120‑day schedule. Based on comparable USACE water‑infrastructure projects, a turnkey solution of this size typically ranges from roughly $500 K for a minimal‑cost vendor to $1.5 M for a firm providing premium materials, full engineering drawings, and a one‑year warranty. Factors influencing the final price include metal‑building cost, pump/compressor specifications, coating system selections, and travel/logistics to the remote Mississippi site.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Holly Grove·Arkansas

Top match · 84%

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Dunedin·Florida

83% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

City of Stillwater·Oklahoma

83% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

City of Hollywood·Florida

82% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Georgia City of Albany·Georgia

82% match

Bid Ref. 27-032 Well No 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

Massachusetts Town of Pembroke·Massachusetts

82% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

City of Hollywood·Florida

82% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Georgia City of Adairsville·Georgia

82% match

City of Adairsville Water Plant Backwash Pump

Closes 11/3/2026Opened 9/21/2026

City of Chicago·Illinois

82% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

State of Michigan Department of Technology, Management and Budget·Michigan

82% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

Massachusetts Auburn Water District Inactive·Massachusetts

82% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

City of Idaho Falls·Idaho

82% match

Well 11 & 12 Rehabilitation

Closes 11/2/2026Opened 9/8/2026

Medina County, OH Sanitary Engineering·Ohio

81% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

Oregon Clackamas County·Oregon

81% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

Northern Virginia Parks·Virginia

81% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

Michigan Department of Technology, Management and Budget (State Facilities Administration, Design & Construction Division)·Michigan

81% match

751/26170.MDL; Muskallonge S.P. - Water & Sanitary Imprvmnts

Closes 12/9/2026Opened 10/16/2026

Navajo Tribal Utility Authority·Arizona

81% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/20/2026

City of Dayton, Ohio·Ohio

81% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

City of Asheville·North Carolina

81% match

Request for Formal Bids for DeBruhl Water Treatment Plant Bulk Chemical Storage Replacement

Closes 12/10/2026Opened 10/29/2026

NYC Department of Environmental Protection (NYCDEP)·New York

81% match

R156-RO2-DB Upgrade of the Main Sewage Pump and Power Distribution Systems at the Rockaway Wastewater Resource Recovery Facility

Closes 11/20/2026Opened 10/13/2026

City of Kyle·Texas

81% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

U.S. Department Of The Interior·Hawaii

81% match

Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment

Closes 11/6/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

81% match

Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)

Closes 12/3/2026Opened 10/27/2026