The City of Adairsville is seeking a qualified contractor to supply, install, and commission a new 75‑hp backwash pump at its municipal water treatment plant, providing redundancy for the existing system. The scope includes engineering‑level coordination, concrete pad construction, anchoring, piping, valve installation, electrical wiring, start‑up testing, and operator training. SCADA integration will be handled by the owner’s system integrator and funded via an allowance item. Bidders must submit sealed bids, provide a 5 % bid bond, and be prepared to furnish performance and payment bonds upon award. The project must be completed within 210 calendar days after notice to proceed.
• Install 75 HP backwash pump and motor
• Construct reinforced concrete pad with anchorage
• Provide and install all associated piping, fittings, check valve, and valves
• Perform electrical wiring to existing control panel (conduit already in place)
• Conduct start‑up, testing, and operator training
• Coordinate SCADA integration (owner‑funded)
• Provide required bid, performance, and payment bonds
• Complete work within 210 days of notice to proceed