Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Water Booster Pump Skid Replacement / DPW

City of Worcester·Massachusetts

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026$450k – $550kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Worcester is seeking a qualified contractor to replace the existing potable‑water booster‑pump skid at its Water Filtration Plant in Holden, MA. The scope includes complete removal of the existing skid, concrete pad repair, supply and installation of a factory‑built tri‑plex pump skid with associated pumps, motors, VFDs, valves, instrumentation, control panel, and SCADA integration, followed by testing, commissioning, training, and warranty documentation. The work must be performed while the plant remains operational, with any shutdowns limited to overnight windows and requiring prior approval. The contract must be completed by 30 Sept 2027, and the bid must be submitted in a sealed envelope by 25 Nov 2026. • Remove and dispose of the existing booster‑pump skid and repair the concrete equipment pad. • Supply, install, align, and commission a new prefabricated tri‑plex skid (pumps, motors, VFDs, control panel, instrumentation, SCADA). • Conduct all required testing, start‑up, and provide two 4‑hour training sessions, operation manuals, warranties, and as‑built drawings. • Comply with extensive MWBE, wage‑theft, prevailing‑wage, safety, noise‑restriction, and environmental requirements; submit weekly payroll and workforce reports; furnish 5 % bid security and 100 % performance/payment bonds.

Attached files

Contact

Jerry Kucera, Buyer(Buyer)

[email protected]

508-799-1220

Key dates

Opened
10/20/2026
Pre-bid meeting
11/12/2026
Closes
11/25/2026
Duration
10 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
8808-J7

Budget estimate

$450,000 – $550,000

The solicitation lists an estimated project cost of $492,000. Assuming the contractor’s profit margin ranges from 5‑15 % after covering labor, materials, equipment, bonds, insurance, and overhead, the net earnings are likely between roughly $450,000 and $550,000. Variations will depend on the final bid price, any approved change orders, and the contractor’s cost structure.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts City of Worcester·Massachusetts

Top match · 93%

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

City of Worcester·Massachusetts

84% match

Waterproofing & Repairs – Union Station Garage / DPF-FTA

Closes 11/4/2026Opened 10/1/2026

Massachusetts City of Worcester·Massachusetts

83% match

8758-M7 Waterproofing & Repairs - Union Station Garage / WRA

Closes 11/3/2026Opened 10/7/2026

City of Montpelier·Vermont

83% match

Wastewater Collection Suction Lift Pump Systems

Closes 11/26/2026Opened 10/28/2026

City of Redding·California

83% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

Massachusetts Dracut Water Supply District·Massachusetts

83% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·Oregon

82% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of Worcester·Massachusetts

82% match

Shoring Equipment / DPW

Closes 11/9/2026Opened 10/27/2026

City of Wilton Manors·Florida

82% match

Lift Station No. 4 Replacement

Closes 11/10/2026Opened 10/8/2026

Georgia City of Adairsville·Georgia

82% match

City of Adairsville Water Plant Backwash Pump

Closes 11/17/2026Opened 9/21/2026

Massachusetts Town of Pembroke·Massachusetts

81% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

New York City Department of Design and Construction·New York

81% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

City of San Clemente·California

81% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of Rochester·New Hampshire

81% match

Bid 27-09 Ryan Circle Pump Station Upgrade

Closes 11/18/2026Opened 10/9/2026

City of Hollywood·Florida

81% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

North Carolina City of Raleigh·North Carolina

81% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

North Attleborough Housing Authority·Massachusetts

81% match

Fire Pump Replacement

Closes 11/5/2026Opened 9/30/2026

Northern Virginia Parks·Virginia

81% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

Massachusetts Town of Hull·Massachusetts

81% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

City of Worcester·Massachusetts

81% match

Roof Replacement - 76 East Worcester St / DPW

Closes 11/13/2026Opened 9/24/2026

Gwinnett County Government·Georgia

81% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026

City of Rockford·Illinois

81% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City of Cambridge·Massachusetts

81% match

FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance

Closes 11/19/2026Opened 10/29/2026

City of Stillwater·Oklahoma

81% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

City of Toledo·Ohio

81% match

Safety Building HVAC Pumps and VFD Replacement

Closes 11/10/2026Opened 10/23/2026