Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Energy and Utilities
  5. ›Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

City of Redding·California

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026$400k – $900kRequest for Proposal
Get bids like this by emailBid source

Description

The City of Redding is seeking a qualified contractor to perform an off‑site overhaul of two Sulzer boiler‑feed water pumps, their associated WEG electric motors, and two Fisher recirculation valves with actuators. All disassembly, cleaning, inspection, repair/re‑conditioning, dynamic balancing, hydro‑static testing, industrial coating, and documentation will be done at the contractor’s shop; the City will handle removal and re‑installation on‑site, with a Technical Field Advisor (TFA) from the contractor providing supervision only. The scope also includes shipping logistics, spare‑parts advisory, and a warranty of at least 12 months post‑commissioning. • Receive, document, and fully disassemble each pump, motor, and valve; perform detailed inspections, dye‑penetrant testing, and repair/replacement of shafts, impellers, bearings, seals, and other wear components. • Conduct dynamic balancing to API standards, hydro‑static and mechanical testing, abrasive‑blast cleaning, and apply matching industrial coating. • Provide comprehensive As‑Found/As‑Left reports, spare‑parts lists, and final project documentation; supply on‑site TFA supervision during removal, installation, alignment, and commissioning. • Manage all shipping, carrier insurance, and logistics; secure required bonds and maintain specified insurance coverage.

Attached files

Contact

Tyler Nash(Utility Analyst)

[email protected]

(530) 225-4068

Key dates

Opened
10/26/2026
Questions due
11/9/2026
Pre-bid meeting
11/5/2026
Site visit
11/5/2026
Closes
12/4/2026
Projected award
2/1/2027
Duration
2 months

Last updated

Details

Type
Request for Proposal
Industry
Energy and Utilities
NAICS
811310
Solicitation №
Schedule No. 5740

Budget estimate

$400,000 – $900,000

Based on typical costs for complete shop overhauls of 300 hp industrial motors, 6‑stage centrifugal pumps, and associated valve refurbishment, each pump‑motor package can run $200‑300 k, plus $50‑80 k for valve work and logistics. Adding engineering, TFA supervision, bonds, and warranty support, the total contract value is likely in the $400 k‑$900 k range. Larger firms with extensive shop capabilities may command the higher end, while smaller specialists could be competitive at the lower end.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Santa Clara Valley Water District·California

Top match · 85%

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of St. Joseph·Missouri

84% match

Wastewater Treatment Boiler Rebuild

Closes 11/11/2026Opened 10/26/2026

The City of Columbus·Ohio

84% match

RFQ033955 - 6009 HCWP 2026 HIGH SERVICE #12 PUMP MOTOR REBUILD

Closes 11/3/2026Opened 10/28/2026

City of Branson·Missouri

84% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Town of Bridgton·Maine

83% match

RFPs Requested – Town Boiler System Replacement

Closes 11/10/2026Opened 10/14/2026

City of Worcester·Massachusetts

83% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Defense·Oregon

83% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of San Diego·California

83% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Dayton, Ohio·Ohio

83% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

County of Sacramento·California

82% match

Chiller Overhaul Maintenance Services

Closes 11/4/2026Opened 10/19/2026

Georgia City of Adairsville·Georgia

82% match

City of Adairsville Water Plant Backwash Pump

Closes 11/17/2026Opened 9/21/2026

Ohio·Ohio

82% match

BOILER MAINTENANCE

Closes 11/16/2026Opened 10/30/2026

California Department of General Services·California

82% match

25-315494.FMD.BoilerMaintenance

Closes 11/4/2026Opened 9/29/2026

City of Toledo·Ohio

82% match

Chemical Feed Boiler Replacement

Closes 11/17/2026Opened 10/23/2026

City of Lakeland·Florida

82% match

ANNUAL ROTATING EQUIPMENT INSPECTION, TESTING, REPAIR, RECONDITIONING AND STORAGE SERVICES

Closes 11/6/2026Opened 10/9/2026

City of Hollywood·Florida

81% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Culver City·California

81% match

Municipal Plunge Equipment Repairs

Closes 11/19/2026Opened 10/22/2026

City of Appleton·Wisconsin

81% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

Gwinnett County Government·Georgia

81% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026

Gwinnett County Government·Georgia

81% match

Bypass Pumping Services on an Annual Contract

Closes 11/6/2026Opened 9/30/2026

New York City Department of Environmental Protection·New York

81% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

Town of Bridgton·Maine

81% match

Town of Bridgton Request for Proposals - Boiler Replacement Project

Closes 11/10/2026Opened 10/14/2026

City of Hollywood·Florida

81% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

The Metropolitan Water District of Southern California·California

81% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Richland·Washington

81% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026