Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Traffic Signal Modification at MacArthur Boulevard and…

City of Santa Ana·California

Traffic Signal Modification at MacArthur Boulevard and Flower Street

Closes 3/4/2026$500k – $600kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Santa Ana Public Works Agency is seeking a qualified contractor to modify and upgrade the traffic‑signal system at the intersection of MacArthur Boulevard and Flower Street. The scope includes demolition of existing signal poles and equipment, installation of new LED luminaires, signal controllers, APS and EVP systems, fiber‑optic communication links, conduit, pull‑boxes, detector loops, CCTV cameras, curb ramps, striping, and related civil works. The work must comply with Caltrans standards, local utility‑locate requirements, prevailing‑wage rules, and a Community Workforce Agreement. Bids are electronic only, with a hard‑copy submission requirement for certain notarized documents. • Remove existing signal hardware and install new LED heads, Leotek GreenCobra luminaires, EconomlITE controllers, Polara APS, GTT Opticom EVP, and vision cameras. • Provide new PVC Schedule 80 conduit (2‑, 3‑, 4‑in.), pull‑boxes (No. 6/6E), 12‑strand SMFO fiber, splice enclosure, and IP‑communication equipment linking to the city’s ATMS. • Perform civil tasks: excavation, foundations, PCC sidewalks and curb ramps, slurry‑seal surfacing, asphalt concrete, utility adjustments, and road‑marking/striping. • Deliver all required permits, bonds, insurance, and submit baseline construction schedule, traffic‑control plan, and weekly look‑ahead updates.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Juan Moreno

(657) 253-0287

Key dates

Opened
2/10/2026
Questions due
2/25/2026
Closes
3/4/2026
Duration
60 Working Days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Project #26-6009

Budget estimate

$500,000 – $600,000

The bid documents list an estimated project value of $550,000. Considering typical contractor margins (10‑15 %) and potential change‑order contingencies, the net earnings for the prime contractor are likely in the $500k‑$600k range. Factors influencing the final amount include the exact quantity of poles, luminaires, conduit runs, and any unforeseen utility conflicts that could generate additional work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Monroe County·New York

Top match · 72%

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Ankeny·Iowa

71% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

California Department of Transportation·California

70% match

Modify the existing traffic control signals.

Closes 11/17/2026Opened 10/26/2026

California Department of Transportation·California

70% match

RHMA, modifying signal and lighting systems and minor concrete.

Closes 12/2/2026Opened 10/26/2026

City of Charlotte·North Carolina

69% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

Monroe County·New York

69% match

Traffic Signal Replacement - South Clinton Avenue at Elmwood Avenue

Closes 12/1/2026Opened 10/31/2026

County of Los Angeles Department of Public Works·California

69% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Charlotte·North Carolina

69% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Bakersfield·California

69% match

Traffic Signal and Lighting System at the Intersection of Calloway Drive and Etchart Road

Closes 11/19/2026Opened 10/29/2026

City of Bloomington·Indiana

69% match

3rd Street Traffic Signal Improvements S. Woodlawn Avenue & S. Hawthorne Drive

Closes 11/18/2026Opened 10/29/2026

City of Moline·Illinois

68% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

Texas Montgomery County·Texas

68% match

Traffic Signal Detection Upgrades (CSJ: 0912-37-267)

Closes 11/12/2026Opened 10/21/2026

City of Clovis·California

68% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

City of Redlands·California

67% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

LA Public Works Engineering Bureau·California

67% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Fort Smith·Arkansas

67% match

TRAFFIC SIGNAL IMPROVEMENTS 25-09-A

Closes 11/10/2026Opened 10/21/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

67% match

Traffic Circle at SW 62nd Ave. And SW 48th Street

Closes 12/2/2026Opened 10/23/2026

City of Bakersfield·California

67% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

City of Fort Smith·Arkansas

67% match

Traffic Signal Improvements Phase A – 2024 Capital Improvements Program

Closes 11/10/2026Opened 10/25/2026

Macomb County Department of Roads·Michigan

66% match

Innovative Traffic Signal Optimizations

Closes 11/3/2026Opened 10/7/2026

Maryland State Highway Administration·Maryland

66% match

PGA435176 - MD 414 (St. Barnabas Road) from IS 95 Ramp 2 to MD 5 Ramp 5 Safety

Closes 12/3/2026Opened 10/27/2026

City of Charlotte·North Carolina

66% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

Knox County·Tennessee

66% match

TURN LANES AND TRAFFIC SIGNAL AT SCHAAD ROAD AND JOHNSON ROAD

Closes 12/3/2026Opened 10/29/2026

City of Philadelphia·Pennsylvania

66% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Redlands·California

66% match

Traffic Signal Head Improvements

Closes 11/16/2026Opened 10/22/2026