Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Architecture
  5. ›A/E RFQ - Texas A&M Evans Library 6th Floor Renovation…

Texas A&M University System·Texas

A/E RFQ - Texas A&M Evans Library 6th Floor Renovation - College Station, Texas

Closes 10/13/2026$600k – $1.2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Texas A&M University System Office of Facilities Planning & Construction is seeking qualified Architect/Engineer firms to submit statements of qualifications for the Evans Library 6th‑floor renovation at Texas A&M University in College Station. The renovation will convert an outdated floor into a modern study environment featuring a grand reading room, individual study rooms with natural light, open seating, upgraded power and lighting infrastructure, and a temporary graduate lounge. The planning budget is $17 million, including $12.27 million earmarked for the construction contract; the remainder covers professional fees, furnishings, contingencies, and other expenses. The RFQ process will identify the top‑ranked firms, with the possibility of interviewing the three highest‑ranked respondents. Submissions must be uploaded to e‑Builder by 2:00 PM Central Time on October 13, 2026. • Scope: Architectural and engineering design services for full‑floor renovation, interior design, MEP coordination, ADA compliance, lighting, AV, and furnishings consulting. • Budget: $17 M total project, $12.27 M construction contract; professional services fee likely 5‑10 % of construction cost. • Deliverables: Design documents, construction drawings, specifications, coordination with construction contractor, and compliance documentation. • Selection: Qualifications‑based, interview stage for top firms. • Location: College Station, Texas (on‑campus).

Attached files

Contact

Oran Mikeal

[email protected]

(979) 933-9863

Key dates

Opened
9/15/2026
Closes
10/13/2026

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541310
Solicitation №
TAMUS-RFQ-02-3479

Budget estimate

$600,000 – $1,200,000

The solicitation does not disclose the architect/engineer fee amount. Based on industry norms, architectural and engineering professional fees for a $12.27 M construction contract typically range from 5 % to 10 % of construction cost. Applying that range yields an estimated fee between roughly $600,000 and $1,200,000. The final budget will depend on the selected firm’s fee structure, scope extensions, and any additional consulting services (e.g., ADA compliance, AV consulting).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texas A&M University System·Texas

Top match · 74%

AE RFQ - West Campus Vivarium - College Station, Texas

Closes 11/10/2026Opened 10/13/2026

University of North Texas System·Texas

72% match

RFQ769-27-1028CS Sycamore Hall Stewardship Renovation

Closes 11/20/2026Opened 10/21/2026

The University of North Carolina·North Carolina

72% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

Texas A&M University·Texas

72% match

Boiler & Refractory Repairs Services

Closes 11/18/2026Opened 10/30/2026

Clear Creek ISD·Texas

71% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

Texas Department of Transportation·Texas

70% match

Training Room Renovation, Wichita Falls DHQ

Closes 12/1/2026Opened 10/16/2026

Texas Angelo State University·Texas

70% match

26-004 RFCSP Porter Henderson Library Restroom Renovation

Closes 11/12/2026Opened 10/15/2026

Clear Creek ISD·Texas

70% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

Texas A&M University System·Texas

69% match

AE RFQ - Virtual Production Institute Fort Worth - Fort Worth, TX

Closes 11/17/2026Opened 10/20/2026

U.S. Department Of Defense·Texas

69% match

Renovate Building 516 at Fort Bliss, Texas

Closes 11/12/2026Opened 10/26/2026

University Of Texas At Austin·Texas

69% match

KIN CP2001827 North Tower Rm Renovations

Closes 11/13/2026Opened 10/12/2026

Texas Department of Transportation·Texas

69% match

Georgetown AEM Renovation and Expansion, Austin District

Closes 12/1/2026Opened 10/15/2026

University of Texas at El Paso·Texas

69% match

Specialty Design Services for Renovation and Repair of Research, Athletic, and Assembly Projects of Limited Scope

Closes 11/6/2026Opened 10/9/2026

Board Of Regents/Texas State University Systems·Texas

69% match

RFQ for Architect/Engineer Services - Student Health Center Expansion for Texas State University in San Marcos, Texas

Closes 11/5/2026Opened 10/13/2026

The University of Texas Medical Branch·Texas

68% match

RFP 27-003 HEC XR Suite

Closes 11/30/2026Opened 10/27/2026

The University of North Carolina·North Carolina

68% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

Bexar County·Texas

68% match

Bexar County Internal Affairs Renovation

Closes 11/4/2026Opened 9/16/2026

The University of North Carolina·North Carolina

68% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Defense·Wisconsin

68% match

Preventative and Corrective Maintenance at 14 TX facilities. See Tech Exhibit Site Map.

Closes 4/30/2027Opened 4/30/2026

University of Southern Mississippi·Mississippi

68% match

RL2605 Aquaculture Visitor Center Elevator Replacement & Renovation (R&R)

Closes 11/6/2026Opened 10/6/2026

Technical College of Georgia·Georgia

68% match

84300 -Cashier Window Renovation

Closes 12/2/2026Opened 10/27/2026

Michigan Allen Park Public School District·Michigan

68% match

BP#20 Riley Center Renovations

Closes 11/20/2026Opened 10/26/2026

Texas Department of Transportation·Texas

68% match

Radio Tower & Building Tower, San Antonio DHQ - SAT

Closes 11/3/2026Opened 9/18/2026

Massachusetts State College Building Authority·Massachusetts

68% match

The RFQ/P is issued according to the Single Selection Method Procedures of the Authority, pursuant t

Closes 11/4/2026Opened 10/14/2026

Arizona State University·Arizona

67% match

CMAR 106232 ECG Renovations

Closes 11/19/2026Opened 10/22/2026