The United States Coast Guard has a requirement to open, inspect, report, and overhaul/repair starter, engine, electrical components. The contractor will be responsible for disassembling, cleaning, and inspecting the starters to determine the estimated cost of overhaul. The contractor must provide a detailed report and repair plan, including material, labor rate, labor hours, overhaul, testing, preservation, coating, packaging, packing, marking, barcoding, and crate repair or replacement costs. The starters must be overhauled to a service-ready condition, which shall restore the operating, coating, and performance characteristics to the original design and technical specifications.
• The contractor must use an appropriate preservative to preserve all uncoated surfaces to prevent rust or corrosion for a minimum of two years.
• Each starter shall be packaged individually, wrapped in plastic, and packed in an appropriately sized wooden box.
• The contractor shall provide certifications of successful standard production tests and inspections to the Contracting Officer.
• The contractor must guarantee the item against defects that lead to failure for 90 days after installation for a period of up to two years after delivery to the Coast Guard.