Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Water and Wastewater
  5. ›Booster Pump Replacements at Pump Stations 89A, 150 and 176

City of Fresno·California

Booster Pump Replacements at Pump Stations 89A, 150 and 176

Closes 4/21/2026$2M – $3.3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Fresno is seeking qualified contractors to replace aging booster pumps at three municipal water‑pump stations (89A, 150, and 176). The work includes removal of existing split‑case pumps, installation of new vertical turbine booster pumps, replacement of a de‑aeration tank with an aeration tank at station 89A, addition of a new blower motor, and associated civil, electrical, and instrumentation work. The contract is a public‑work, prevailing‑wage project with a $3.3 M construction allocation, requiring a 10 % bid bond, and 100 % payment and performance bonds after award. Bids must be submitted electronically by 3 PM on April 21 2026, with a pre‑bid conference on April 7 2026 (non‑mandatory). Successful bidders must hold a valid California Class “A” contractor’s license and comply with the City’s Community Workforce Agreement and local‑preference requirements. • Replace split‑case booster pumps with vertical turbine pumps at three stations (89A, 150, 176). • Install a new aeration tank and blower motor at station 89A, plus full civil, structural, electrical, and instrumentation upgrades. • Project budget ≈ $3.3 M; 55‑working‑day completion period; mandatory 10 % bid bond and 100 % performance/payment bonds. • Public‑work status with prevailing‑wage, local‑preference, and Community Workforce Agreement compliance required. • Electronic bid submission via Planet Bids; pre‑bid conference (April 7) optional but recommended for clarification.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Adrian Ontiveros(Procurement Specialist)

[email protected]

(559) 621‑1165

Key dates

Opened
3/25/2026
Pre-bid meeting
4/7/2026
Closes
4/21/2026
Duration
55 working days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
12601793

Budget estimate

$2,000,000 – $3,300,000

The solicitation lists a $3.3 M construction allocation, but the actual contract value is likely lower after accounting for subcontractor margins, contingency, and the City’s local‑preference adjustments. A reasonable estimate for the contractor’s net earnings would fall between $2 M and $3.3 M, depending on the final bid price, scope of supplemental work, and any change orders. Factors influencing the range include the cost of vertical turbine pumps, civil foundation work, prevailing‑wage labor rates, and the 10 % bid bond requirement.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Branson·Missouri

Top match · 73%

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Clark County Country Water Facilities·Arkansas

70% match

Advertisement for Bids – Rehabilitation of Two Booster Pump Stations

Closes 11/18/2026Opened 10/18/2026

City of Fort Myers·Florida

68% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

Georgia Emanuel County Board of Education·Georgia

68% match

Swainsboro High School Concession Stand Pump Station Upgrade

Closes 11/13/2026Opened 10/30/2026

U.S. Department Of Defense·Washington

66% match

43--PUMP,ROTARY

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

Jackson County Utility Authority·Mississippi

66% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

City of Camden·South Carolina

66% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

66% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

City of Mandeville·Louisiana

66% match

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

66% match

29--VALVE,FUEL PUMP

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,ROTARY

Closes 11/1/2026Opened 10/20/2026

City of Key West·Florida

65% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

City of Hilliard, Ohio·Ohio

65% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of Orlando·Florida

65% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

Miami‑Dade County Water & Sewer Department·Florida

65% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

City of San Diego·California

65% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

65% match

29--PUMP,FUEL,METERING AND

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

PUMP,FUEL,METERING

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,ROTARY

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,ROTARY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Oklahoma

65% match

17--PUMP,HYDRAULIC,HAND

Closes 11/8/2026Opened 10/29/2026

Jea·Florida

64% match

1412232281 (IFB) Carlotta Road Pump Station Upgrade

Closes 12/1/2026Opened 10/28/2026

Brazos Valley·Texas

64% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

St. Bernard Parish Government·Louisiana

64% match

Grundfos SLV Pumps or Equal St. Bernard Parish Government Department of Public Works Water and Sewer Division

Closes 11/17/2026Opened 10/29/2026