Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›402-23-794 Modernize Campus Corridors

U.S. Department Of Veterans Affairs·Maine

402-23-794 Modernize Campus Corridors

Closes 9/8/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves a 15,600-square-foot interior renovation of the Main Street Corridor connecting Buildings B209 and B221 at the Togus VA Medical Center in Augusta, Maine. The project includes comprehensive site preparation, demolition, and construction activities to modernize the campus corridors at the Togus VA Medical Center. Work consists of replacing flooring, roofing, interior finishes, and improving HVAC systems in occupied buildings while maintaining uninterrupted medical center operations. The contractor is responsible for developing VA-compliant phasing, life safety, security, environmental protection, and utility-interruption plans. • The contractor must ensure that all employees comply with the VA security management program and obtain permission from the VA police. • The contractor is responsible for safekeeping all project information and sharing it only with those who need it to accomplish the project. • The contractor must maintain a minimum temperature of 4 degrees C (40 degrees F) at all times and maintain existing fire protection and alarm equipment in operating condition. • The contractor must provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Attached files

Contact

Alexandru Sava

[email protected]

Key dates

Opened
7/31/2026
Closes
9/8/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
36C24126R0120

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work, which includes a 15,600-square-foot interior renovation. The cost of such a project can vary widely depending on factors such as materials, labor, and location. However, a rough estimate for a project of this size could be in the range of $5 million to $15 million. This estimate is based on industry standards for construction costs per square foot, which can range from $200 to $500 per square foot for a project of this type.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The Ohio State University·Ohio

Top match · 66%

OSU-240175, Research Admin Bldg - 4th Floor Renovation

Closes 11/19/2026Opened 10/28/2026

The University of North Carolina·North Carolina

66% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

Northern Virginia Community College·Virginia

66% match

260-B5260-007 CM Engineering Lab & Pantry

Closes 11/9/2026Opened 10/6/2026

Trident Technical College·South Carolina

65% match

TTC - Thornley Campus Building 900 President's Suite Renovation

Closes 11/11/2026Opened 10/16/2026

U.S. Department Of Veterans Affairs·Oregon

64% match

Z2DA--692-26-201 Refresh Halls and Walls throughout Campus

Closes 11/3/2026Opened 10/16/2026

State University of New York (SUNY)·New York

64% match

231078 - Reconstruct Portions of Cornell Drive

Closes 11/10/2026Opened 10/20/2026

Northern Virginia Community College·Virginia

64% match

260-B5260-015 NVCC LC Relocate Fitness Center

Closes 11/10/2026Opened 9/24/2026

University of North Dakota·North Dakota

64% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

Virginia Community College System - System Office·Virginia

64% match

Renovate Bathrooms for ADA Compliance at Rappahannock Community College, Glenns and Warsaw Campuses, PC#260-B6260-029 (M24RC127)

Closes 11/12/2026Opened 10/13/2026

North Carolina Robeson Community College·North Carolina

64% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

Virginia Community College System - System Office·Virginia

64% match

Renovate Welding Lab - Discovery 112 & 116 at Brightpoint Community College, Chester Campus, PC#260-B6260-030 (L25BC266)

Closes 11/4/2026Opened 10/5/2026

Grayson College·Texas

64% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

University of North Texas System·Texas

64% match

RFQ769-27-1028CS Sycamore Hall Stewardship Renovation

Closes 11/20/2026Opened 10/21/2026

The University of North Carolina·North Carolina

64% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

State University of New York (SUNY)·New York

64% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

Northeast Wisconsin Technical College·Wisconsin

64% match

DO_CO and AG_SC Comp

Closes 11/24/2026Opened 10/28/2026

Virginia Department of Transportation·Virginia

63% match

B11_2027 SMART SCALE CORRIDOR IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

Niagara Frontier Transit Authority (NFTA)·New York

63% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

LA County Public Works·California

63% match

BRC0000667 - On-Call Commercial and Institutional Recycling Program

Closes 11/10/2026Opened 10/5/2026

State University of New York (SUNY)·New York

63% match

Roosevelt Hall Renovations-Design Services

Closes 11/19/2026Opened 10/28/2026

The University of Iowa·Iowa

63% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

The University of North Carolina·North Carolina

63% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

University Of Texas At Austin·Texas

63% match

KIN CP2001827 North Tower Rm Renovations

Closes 11/13/2026Opened 10/12/2026

Wright State University - Design and Construction·Ohio

63% match

WSU25-0088 Paul Laurance Dunbar Vestibule and Concrete Replacement

Closes 11/23/2026Opened 10/27/2026

Iowa State University·Iowa

63% match

CP1275129-Linden Residence Hall-North Retaining Wall-Repairs

Closes 11/12/2026Opened 10/15/2026