Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Sources Sought Notice for High-Speed Fiber-Optic Wi-Fi

U.S. Department Of Defense·Colorado

Sources Sought Notice for High-Speed Fiber-Optic Wi-Fi

Closes 2/27/2026$100k – $500kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of the Air Force, Buckley Space Force Base, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft. and requires a high-density environment of over 1,500 simultaneous users. The desired solution must include a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. The key requirements for the solution include a 1 Gbps symmetrical dedicated fiber optic circuit, enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. The solution should be provided on a monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Some of the key features of the required solution include: • Turnkey Solution: Provide, manage, and maintain all components required for the service. • Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. • Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. • Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. • License Management: Contractor is responsible for managing all required software and service licenses.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Travis Fritts

[email protected]

(720) 847-6571

Key dates

Opened
2/18/2026
Closes
2/27/2026

Last updated

Details

Type
Request for Information
Industry
Telecommunications
NAICS
5171
Solicitation №
FA2543FitnessCenterWi-Fi

Budget estimate

$100,000 – $500,000

The budget for this opportunity can be estimated based on the scope of work and the required services. The contractor will need to provide a turnkey solution, including all necessary hardware, installation, and ongoing support. The cost of the solution will depend on the specific requirements of the project, including the number of users, the size of the facility, and the level of support required. A rough estimate for the budget could be between $100,000 and $500,000 per year, considering the monthly subscription basis and the scope of work. The actual budget will depend on the contractor's proposal and the government's evaluation of the proposal.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Utility Board of the City of Key West·Florida

Top match · 67%

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

Columbia Public Schools·Missouri

66% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

Robla School District·California

66% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

City of Charlotte·North Carolina

66% match

RFP AVIA 26-13 CLT Internet Circuits

Rolling / TBD closeOpened 4/21/2026

City of Sherwood·Oregon

66% match

Fiber to the Home Construction Project

Closes 11/20/2026Opened 10/14/2026

U.S. Department Of Defense·Ohio

66% match

Intent to Sole Source: AFIT - High Finesse WS8-2 Wavemeter

Closes 11/6/2026Opened 10/23/2026

Georgia Butts County Schools (Butts County School District)·Georgia

66% match

RFP - Fiber Optic WAN Service

Closes 11/27/2026Opened 10/27/2026

Merced County Office of Education·California

66% match

MERCED COUNTY OFFICE OF EDUCATION (MCOE) E‑Rate Year 2024 Request for Proposal

Rolling / TBD closeOpened 4/25/2026

U.S. Department Of Defense·Florida

66% match

PROVIDE, INSTALL AND MAINTAIN AN INTERNET SERVICE WITH A MINIMUM OF 200MB UP AND DOWNLOAD SPEEDS IN FL

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

CABLE,FIBER OPTIC

Closes 11/13/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

66% match

60--CABLE,FIBER OPTIC

Closes 11/6/2026Opened 10/7/2026

Palm Beach County·Florida

66% match

PRE-QUAL FOR FIBER OPTIC CABLE

Closes 6/27/2029Opened 1/23/2026

U.S. Department Of Defense·United States of America

65% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/9/2026Opened 9/25/2026

Indiana Library·Indiana

65% match

E-Rate Service

Closes 11/11/2026Opened 9/18/2026

U.S. Department Of Defense·United States of America

65% match

61--CABLE,RADIO FREQUENCY

Closes 11/1/2026Opened 10/21/2026

Washington Technology Solutions (WaTech)·Washington

65% match

Wireline Ethernet or Fixed Wireless Services

Closes 11/12/2026Opened 10/21/2026

University of Missouri System·Missouri

65% match

Data Transport Services and Dark Fiber

Closes 12/11/2026Opened 10/22/2026

Massachusetts Executive Office of Technology Services and Security·Massachusetts

65% match

Notice of Purchase Mass Technology Collaborative

Closes 6/30/2038Opened 7/21/2011

Massachusetts Bay Transportation Authority·Massachusetts

65% match

IFB # 133-26: Furnish Fiber Optic Cable

Closes 11/4/2026Opened 10/8/2026

St. Charles Parish Public Schools·Louisiana

65% match

REQUEST FOR PROPOSALS AND ACCOMPANYING DOCUMENTS FOR INTERNET ACCESS AND WIDE AREA NETWORK CONNECTIONS

Closes 12/11/2026Opened 10/1/2026

Clinton National Airport·Arkansas

65% match

Wi-Fi Upgrade

Rolling / TBD closeOpened 4/14/2026

U.S. Department Of Defense·Pennsylvania

65% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/9/2026Opened 9/25/2026

NYS Development Authority of the North Country·New York

65% match

FIBER CABLE CONSTRUCTION: BORKOWSKI ROAD WIRELESS TOWER

Closes 11/2/2026Opened 10/9/2026

Navajo Nation·Arizona

65% match

Proposal for Lit Fiber With Special Construction -AZ Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

U.S. Department Of Defense·New York

65% match

ULTRA-BROADBAND TERAHERTZ RADIO DEVELOPMENT

Closes 9/19/2028Opened 9/19/2023