The State of California seeks a qualified contractor to design, supply, install, test, and commission Level 1, Level 2, and DC‑Fast‑Charge electric‑vehicle charging stations at the Teerink Pumping Plant in Kern County. The work includes full electrical infrastructure, civil site‑work (trenching, back‑filling, concrete pads, bollards, ADA‑accessible ports), environmental safeguards, and comprehensive documentation for close‑out. The contract is a lump‑sum, firm‑fixed‑price award with a 60‑day performance period, requiring 100 % performance and payment bonds, a 5 % retainage, and adherence to prevailing‑wage, safety, and sustainability requirements.
• Install EVSE hardware (Level 1, Level 2, DC‑Fast) with all associated wiring, conduits, grounding, and network management.
• Perform civil works: trenching, back‑filling, concrete foundations, bollard installation, and lot restoration to original condition.
• Provide testing, commissioning, as‑built drawings, operation manuals, warranties, and waste‑management/recycled‑content certifications.
• Must hold a C‑10 electrical contractor license, be a certified small‑business (or meet subcontracting thresholds), and attend the mandatory virtual pre‑bid inspection on September 22, 2026.