The Mingo National Wildlife Refuge is seeking quotes from contractors to complete road rehabilitation projects on the refuge. The project involves hauling and tailgate spreading gravel on up to 8.35 miles of gravel road within the refuge. The contractor shall provide the aggregate and incidentals, and the refuge will work with the contractor to close roads to the public if necessary. The project requires the contractor to haul and spread 4 inches of one inch minus aggregate along the entire road surface, and any damage to the existing gravel road is the responsibility of the contractor to fix.
• The project includes four segments of road: Redmill Drive 1st Segment (1.2 miles), Redmill Drive 2nd Segment (2.1 miles), Redmill Drive 3rd Segment (1.8 miles), and Sandblow Ridge Road (3.25 miles).
• The contractor must inform the contact listed above at least 48 hours in advance prior to starting work on site.
• The contractor must secure equipment left on-site and is responsible for cleaning equipment pre and post entry of the site for noxious and invasive species.
• The work must be conducted in a manner that minimizes rutting, disturbance, or compaction of soil or sod and the spread of noxious and invasive species.
• Payment will be processed following receipt of proper invoices and inspection of work for contract compliance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.