Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Atlantic Drive Drainage Improvement

Town of Lantana·Florida

Atlantic Drive Drainage Improvement

Closes 10/28/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Lantana is seeking bids for the Atlantic Drive Drainage Improvement project, which includes the installation of stormwater improvements and asphalt placement to reduce flooding within the right-of-way on portions of North Atlantic Drive, SE Atlantic Drive, Beach Curve Road, and Barefoot Lane. The project will be completed in phases, with the south portion during "season" and the north portion during "off-season" (summer). The contractor will need to perform work on the south portion of the project during "season" and the north portion during "off-season" (summer). An acceptable plan will be required for the final award. Key aspects of the project include: • Installation of stormwater improvements • Asphalt placement to reduce flooding • Completion of the project in phases • Performance of work on the south portion during "season" and the north portion during "off-season" (summer) • Requirement of an acceptable plan for the final award

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jerry Darr(Assistant Director of Utilities)

[email protected]

Key dates

Opened
9/28/2025
Pre-bid meeting
10/7/2025Mandatory
Site visit
10/7/2025Mandatory
Closes
10/28/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
ITB-ITB NO. 2025-13-PS-0-2025/JD

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated in the document, but based on the scope of work, which includes the installation of stormwater improvements and asphalt placement, it can be estimated to be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the project requires significant construction work, including excavation, piping, and asphalt placement. However, the actual budget may vary depending on the complexity of the project, the materials required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of South Hill·Virginia

Top match · 71%

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Easley·South Carolina

71% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

71% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

71% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

71% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

70% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

69% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

69% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

69% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

68% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

68% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

68% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

City of South Miami·Florida

68% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

68% match

Collective AJ Storm Drainage Improvement Projects

Rolling / TBD closeOpened 3/29/2026

City of North Charleston·South Carolina

68% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of Charlotte·North Carolina

68% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

68% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

City of Charlotte·North Carolina

68% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

The Village of Royal Palm Beach·Florida

68% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

City of Charlotte·North Carolina

68% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

67% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

67% match

1206 Georgetown Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

City of Charlotte·North Carolina

67% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

Maryland Baltimore City Department of Public Works·Maryland

67% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

67% match

6th and Graham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027