The Grand River Dam Authority is seeking a qualified contractor to perform comprehensive lead‑based paint abatement, abrasive blasting, structural repairs, recoating, and insulation of seven large powerhouse hatch covers at the Robert S. Kerr Dam. The scope includes hazardous‑coating removal, containment, waste handling, installation of 2‑in. fiberglass insulation, and optional painting of a U.S. flag on one hatch cover. All work must comply with AMPP QP1 and QP2 certifications, SSPC containment standards, and lead‑abatement regulations.
• Lead‑based paint removal and OSHA/DEQ lead‑abatement compliance (QP1 & QP2 certifications required).
• Near‑white abrasive blast (SSPC‑SP 10) and structural repairs (AWS D1.1/D1.1M).
• Three‑coat exterior zinc‑rich/epoxy/polysiloxane system and two‑coat interior system applied to hatch covers.
• Installation of 2‑in. Owens‑Corning Type 705 fiberglass insulation with foil‑reinforced kraft facing.
• Mandatory pre‑bid site visit on 23 Sept 2026; Q&A closes 28 Sept 2026; bid due 14 Oct 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.