Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 7.037 Miles of Road Overlay – Desoto…

Mississippi

Construction of 7.037 Miles of Road Overlay – Desoto County, MS (SAP‑17(18)M)

Closes 10/9/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The DeSoto County Board of Supervisors is soliciting sealed bids for the construction of approximately 7.0 mi of asphalt overlay on four county roads (Holly Springs Rd, Nesbit Rd, Nail Rd, and a fourth road). The scope includes full‑depth removal of existing pavement, placement of granular base material, multiple layers of new asphalt (19 mm and 9.5 mm), cold‑milling, traffic control signage, temporary striping, and related traffic‑management items. Bidders must submit complete bid books, a 5 % bid bond payable to DeSoto County and the State of Mississippi, and, for contracts exceeding $50,000, a Certificate of Responsibility or a statement of exemption. Plans and specifications are available for a fee ($75 for plans, $25 for the proposal) at the County Engineer’s office or via Central Bidding. The contract will be awarded to the lowest qualified bidder and is subject to Mississippi state procurement and licensing rules. • Project: 7.037 mi of road overlay (SAP‑17(18)M) • Location: Desoto County, Mississippi (Hernando, MS) • Bid deadline: 10:00 AM, 9 Oct 2026 (sealed or electronic) • Contract duration: 54 working days • Required documents: bid bond (5 %), Certificate of Responsibility (if > $50 k), full bid book, plans/proposals (paid) • Contact for questions: Vickie Tillman, [email protected] • Submission methods: sealed envelope at County Procurement Office or electronically via www.centralbidding.com

Attached files

Contact

Vickie Tillman

[email protected]

Key dates

Opened
9/23/2026
Closes
10/9/2026
Duration
54 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
113-20260910122229 BSDC

Budget estimate

$5,000,000 – $15,000,000

No award amount is disclosed. Based on typical Mississippi road‑overlay costs of roughly $0.7 M to $2 M per mile (including materials, labor, traffic control, and overhead), a 7‑mile project would likely be valued between $5 million and $15 million. The final figure will depend on unit prices for asphalt, base material, and the extensive traffic‑control items listed.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Flowood·Mississippi

Top match · 76%

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

Mississippi Jasper County Board of Supervisors·Mississippi

73% match

Asphalt Paving and Road Improvements Project

Closes 11/2/2026Opened 10/30/2026

Marshall County Board of Supervisors·Mississippi

73% match

Asphalt Paving Project Barringer Road and Dogwood Road DIP 448 for the Marshall County Board of Supervisors

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Transportation·Mississippi

73% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Minnesota Department of Transportation·Minnesota

72% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Nevada Government·Nevada

71% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Texas Department of Transportation·Texas

71% match

STATE LET CONSTRUCTION CONTRACT, HAYS CO, FDR, EDGE MILL, UNDERSEAL AND TOM OVERLAY FR

Closes 11/4/2026Opened 10/7/2026

DeSoto County·Mississippi

71% match

DeSoto County Search and Rescue Building Asphalt Paving

Closes 11/10/2026Opened 10/22/2026

Lapeer County Road Commission·Michigan

71% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

Spartanburg County·South Carolina

70% match

SPARTANBURG COUNTY NEW CUT ROAD INTERSECTION IMPROVEMENTS AT MT. ZION & BLACKSTOCK ROAD

Closes 11/19/2026Opened 10/27/2026

Minnesota Department of Transportation·Minnesota

70% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Lexington County·South Carolina

70% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

St. Tammany Parish Government·Louisiana

70% match

Cross Gates Subdivision Highway Resurfacing Project

Closes 12/3/2026Opened 10/28/2026

County of Volusia·Florida

70% match

Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44

Closes 12/1/2026Opened 10/27/2026

DeSoto Parish Police Jury·Louisiana

70% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

U.S. Department Of Defense·Mississippi

70% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

Minnesota Department of Transportation·Minnesota

70% match

Grading, Concrete & Bituminous Surfacing, Lighting, and Bridge No.s 53827‑53830

Closes 11/4/2026Opened 10/16/2026

City of Fairfield·Ohio

69% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

Bluewing Civil Consultants, LLC.·Louisiana

69% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

Minnesota Department of Transportation·Minnesota

69% match

260151 SP 2787-31

Closes 11/18/2026Opened 10/21/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·Mississippi

69% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 9/18/2026

City of Toledo·Ohio

69% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

Panola County Board of Supervisors·Mississippi

69% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

Loudoun County·Virginia

69% match

Route 15 North Widening: Battlefield Parkway to Montresor Road, IFB NG00004

Closes 11/20/2026Opened 10/13/2026